Skip to content

[TUI] Rework overview around spend, tokens, time, and slow-run triage #142

Description

@luoyuctl

Problem

The overview screen has the right raw signals, but the first viewport does not clearly prioritize the two core jobs:

  • review historical spend across cost, tokens, and elapsed time
  • jump into the runs most likely to explain slow agent tasks

Current screenshot:

Overview

Expected direction

  • Make spend and time the first visual hierarchy: total cost, total tokens, elapsed time, P95 latency, top agent, top model.
  • Add a clear "inspect first" section with the top expensive, top slow, and critical sessions.
  • Reduce equal-weight boxes so the screen reads less like a generic metrics dump.
  • Keep the shortcut hints, but make the primary action visually stronger.

Validation notes

Captured from a real local run, not demo data.

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions