You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit 5d4151e
Browse filesBrowse the repository at this point in the historyBrowse files
docs(devlog): correct the closeout count and record the red merge
Two corrections from the promotion audit.
The closed table listed #1894, #1843 and #1899 as issues. #1899 is a pull
request, so two issues closed this campaign, not three - the original phrasing
overstated the run.
And PR #1921's merge commit carries a failing hosted run. The failure is a
wall-clock assertion in request-pacing, the classic flake shape on a loaded
macOS runner, and every subsequent run on dev is green including the current
head. Not a blocker, but it landed red and the record did not say so. A campaign
record that omits the one merge that went in red is not one you can trust later.
Also supersedes the no-green-run statement: run 32090176020 on 9eb3a10 is
completed/success with every job green.
0 commit comments