Copy file name to clipboardExpand all lines: devlog/_plan/260817_wave5_execution/090_wave6_closeout.md
+140-2Lines changed: 140 additions & 2 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -71,7 +71,7 @@ of them:
71
71
72
72
| PR | Held because |
73
73
|----|--------------|
74
-
|#1891|it makes `GOOGLE_ANTIGRAVITY_USER_AGENT` steerable into the `onboardUser` request body, violating this wave's accept criterion. Needs #1889 first, which is the one-line fix that makes `ide_version` a real constant. Detail in `080`.|
74
+
|#1891|**held during the campaign, then merged afterwards** as `5c66ad205` — see the correction below|
75
75
|#1889| unsponsored `src/oauth/` surface, plus still draft. The `maintainer-sponsored` label is the record that a security review happened, so an agent applying it would falsify that record. |
76
76
77
77
Neither is affected by the close-on-dev-merge decision: both are blocked *before* merge, so the
@@ -104,7 +104,7 @@ worth making about the policy change. It removed a gate that was never what held
104
104
105
105
### Promotion state
106
106
107
-
`dev` carries nine merged PRs from this campaign. `preview` and `main` are both behind it, and
107
+
`dev` carries this campaign's merges. `preview` and `main` are both behind it, and
108
108
`dev`'s own hosted CI has no completed green run on its current head — the runs at `2b12521ee`
109
109
and `aca3c0241` were both cancelled by supersession as later merges landed. The local full
110
110
suite above is the evidence that exists; a hosted run on the exact promotion head is the
@@ -128,3 +128,141 @@ all three OSes, npm-global on all three, gates, storage policy, api usage.
128
128
129
129
So the hosted evidence now exists. Promote the head CI actually evaluated; promoting a local ref
130
130
that no run has seen would re-open the exact gap this section was written about.
131
+
## Correction: #1891 merged, and the record said otherwise
132
+
133
+
I held #1891 and argued #1889 must land first, because #1889 is the one-line fix that makes
134
+
`ide_version` a real constant. **#1891 merged at 02:25:46Z as `5c66ad205` without it. #1889 is
135
+
still open and draft.**
136
+
137
+
For a while this document, and both promotion PR descriptions, described #1891 as deliberately
138
+
excluded while it was sitting on the promotion head. That is the worst kind of error in a record
139
+
meant to inform an approval: a maintainer reading it would have approved a promotion believing
140
+
it excluded a change it contained. Corrected in all three places.
141
+
142
+
The underlying concern *is* addressed on this head, by a different route than the hold pointed
143
+
at: **#1955** (merge `19464a720`, commit `e9b2a0a63`) changed `ide_version` to
144
+
`ANTIGRAVITY_IDE_VERSION`, so the body field no longer carries the User-Agent at all. The hold
145
+
was right about the defect and wrong about which PR would fix it.
146
+
147
+
*Attribution corrected: I first credited this to **#1957**, which is documentation-only — its
148
+
merge `c3bf2c295` touches two devlog files and zero code. Its title mentions the fix because it
149
+
carried the record of it, three minutes after #1955 landed the code. `git log -S 'ide_version:
150
+
ANTIGRAVITY_IDE_VERSION'` returns exactly one commit, and it is #1955's. A maintainer checking
151
+
#1957's diff to verify the claim would have found no code and had good reason to distrust the
152
+
rest of this document.*
153
+
154
+
Two smaller corrections in the same pass:
155
+
156
+
-**"every subsequent hosted run on `dev` is green"** was not backed. **Six or more** of the runs
157
+
after `9dbc5fc42` are *cancelled* by supersession, and cancelled is not green. The accurate
158
+
statement is that the completed runs after it are green, and most never completed — this
159
+
branch supersedes its own runs faster than they finish.
160
+
-**The PR count is dropped rather than corrected, and this time actually dropped.** I wrote
161
+
nine, then ten, then claimed to drop it while leaving "nine merged PRs" standing in the
162
+
Promotion state section and substituting an equally underived "seventeen" here. Three wrong
163
+
numbers and a false claim to have stopped giving numbers.
164
+
165
+
The derived figure, for anyone who wants one: **23** merge commits between `v2.24.2`
166
+
(`474584bcd`) and the promotion head touch `src/` or `tests/`, out of 32 merges total. That
167
+
range includes work outside this campaign, which is exactly why the per-PR accounting in the
168
+
wave documents is the thing to read instead of a headline count.
169
+
- The closure-rules section still says #1843 was "released in v2.24.2"; the results table saying
170
+
**v2.24.0** is the correct one, confirmed by `ac8c0d2df` being contained in that tag.