Skip to content

Add fields in BO datamodel #2189

Closed
Closed

Description

@tse-tarn-france

Is your feature request the result of a bug?
NO

Problem
We would need a "note" field in BO, and a dotted progress bar or step dot progress bar which could be a datamodel itself

Explanation :

When buyers exchange information with prodution teams regarding a SO ans its BO, they use today an excel file which one column is "notes" for example "Will lack 200 x 2N2222 awaited for March 11th" => with that king of informations production teams can state wether the start one batch now and 2nd batch when received missing 2N2222 or the whole BO in one batch on complete 200 last PCB later.

dotted progress bar ( I assume this is more hard to implement )

We use 5 or 6 key indicators to produce a PCB :
PCB are availables in inventory / Stencil does already exist or must be prepared ; if Stencils exists, include its Id
SMD components are availables in inventory ( means BO can start for SMD assembly step )
Trough-hole components are availables in inventory ( means BO can start for trough-hole assembly step )
Production datas are available ( P&P datas ) and ready to use or need to be prepared

Suggested solution
At first maybe 5 or 6 more fields and when possible these files will be concatened into a dotted progress bar ?

Describe alternatives you've considered
Just 5 or 6 more fields which name is "user-defined" with default set to "step1, step2, etc ..."

Examples of other systems
our excel file :

BO_list+_excel

Do you want to develop this?
As previous, why not with help

Activity

  1. added
    enhancement
    on Oct 21, 2021
  2. tse-tarn-france commented on Oct 21, 2021

    @tse-tarn-france
    Author

    PS:

    result should appear in BO list :

    bo_list

  3. added
    build
    question
    on Oct 22, 2021
  4. matmair commented on Oct 22, 2021

    @matmair
    Member

    @tse-tarn-france that is quite a complex requirement as adding just 5 steps sounds like a fast but messy solution. Maybe with a kind of workflow model that allows you to add workflows, this could be solved.

    Would we even support something like this @eeintech @SchrodingersGat ?

  5. eeintech commented on Oct 22, 2021

    @eeintech
    Contributor

    Just to understand the original idea, what is proposed here is to divide a build order into multiple steps?

  6. matmair commented on Oct 22, 2021

    @matmair
    Member

    @eeintech I would just add a model that can be used to define tasks/storypoints that should. And not really touch BOs.

  7. tse-tarn-france commented on Oct 22, 2021

    @tse-tarn-france
    Author

    I think this may be the good way, the idea is not to add workflow steps but just indeed a datamodel which can be used as you say like tasks checklist or storypoints ; the user would be able to define how many "checkpoints" he needs and the name of each "checkpoint" ; as you can see in excel file we use, "checkpoint list" is part of the BO line.

  8. removed
    question
    on Oct 23, 2021
  9. matmair commented on Oct 23, 2021

    @matmair
    Member

    @tse-tarn-france sounds good. Before developing I would wait for confirmation of @SchrodingersGat if he would like to have this feature as it adds quite a lot of UI stuff.
    On a formal note - could you add '[FR]' before your issue title? That means 'Feature Request' and distinguishes between bugs, wishes and older notes.

  10. SchrodingersGat commented on Oct 24, 2021

    @SchrodingersGat
    Member

    This does seem like a pretty complex feature which could quickly grow out of hand with feature creep.

    What I am interpreting from your request is an addition of "required steps" or "checkpoint" as @matmair and @eeintech point out above.

    However it sounds like it goes beyond that... In addition to a simple "list of steps" that must be ticked off, certain line items in the build / BOM depend on the state of those "required steps". Coding in these additional relationships according to the user requirements could be very tricky!

    With regard to a simple "required steps" approach - currently we do support "tests" for stock items, for example:

    • programmed firmware
    • perform calibration
    • attach wires

    These are more at the "commissioning" stage, rather than the "build" stage. But a similar concept might apply here.

    If you can describe your ideas a bit further, perhaps there is something that can be achieved.

  11. SchrodingersGat commented on Mar 2, 2022

    @SchrodingersGat
    Member

    @tse-tarn-france I'm going to close out this issue for now, due to lack of response. If you have anything further to add to this, please get back to us!

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    buildenhancement

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions