Skip to content

ci: measure must-call-assert optimization on slim #7

ci: measure must-call-assert optimization on slim

ci: measure must-call-assert optimization on slim #7

Triggered via push September 30, 2026 03:36
Status Cancelled
Total duration 2h 24m 5s
Artifacts –
Matrix: combined-slim
Fit to window
Zoom out
Zoom in

Annotations

8 errors
combined-slim (7)
The job has exceeded the maximum execution time of 15m0s
combined-slim (7)
The operation was canceled.
combined-slim (11)
The job has exceeded the maximum execution time of 15m0s
combined-slim (11)
The operation was canceled.
combined-slim (35)
The job has exceeded the maximum execution time of 15m0s
combined-slim (35)
The operation was canceled.
combined-slim (44)
The job has exceeded the maximum execution time of 15m0s
combined-slim (44)
The operation was canceled.