Repository navigation
chore(upstream): watch two post-target corrections and drop the recorded Haiku entry - #1152
Merged
Merged
Conversation
…ded Haiku entry Batch 33 took pingdotgg#20325 (centered Markdown table cells) and batch 34 takes pingdotgg#19964 (pooled usage bar layout). Upstream corrected both after the intake target, in pingdotgg#22482 and pingdotgg#22395, so track them until intake reaches them. pingdotgg#14445 is recorded by batch 33, so its watch entry goes.
Upstream divergenceBoth sides are compared with upstream at the in-order tip
No upstream file changes how much it differs from upstream. |
Thread transfer impact✅ Thread transfer remains within every enforced ceiling.
Baseline: Scenario and decoded snapshot size10 historical turns, 5 command tools per turn, 878.9 KiB retained MCP result per historical turn, and a 1.05 MiB retained result in the measured turn.
Updated in place by a trusted workflow. PR artifacts are strictly validated and never executed. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Intake batches 33 and 34 take two upstream changes in order that upstream later corrected, after the fixed intake target:
This adds watch entries for both corrections so the tracked PR report shows them until intake reaches them, or until we decide to import them early. It also removes the pingdotgg#14445 entry, which batch 33 recorded after its early import.
State-only change to
.github/upstream-tracked-prs.json; no code. The next intake survey does not depend on it.Written by an agent (Claude Code, claude-opus-5-5).