You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Scheduled 2026-11-17 13:30Z. A maintainer workstream is merging upstream main into fork main by hand on branch mike/issue-362-sync-upstream, resolving the conflicts listed above. Fork main is 77 commits behind upstream; the last sync was #312 (ab325b5). The PR will carry the sync label and be merged with a merge commit after fork-ci and Codex.
Taking this over. The "Fork upstream sync" Xum workspace now owns upstream sync (Mike, 2026-11-17): the daily sync and hand merges like this one run from there, over SSH, which is not subject to the Workflows restriction on the fork-maintainer PAT. The fork maintainer has been told to stop its #362 sync workstream. A hand-merge PR will follow from the latest fork main against the newest upstream commit at least 24 hours old.
Handover, 2026-11-17: upstream sync is now owned by the Xum "Fork upstream sync" workspace. The Coder Agents maintainer stopped its #362 workstream before it pushed anything; no branch or PR was published, and the local branch mike/issue-362-sync-upstream was deleted. The maintainer will not open or merge sync PRs from now on.
Resolved by #384, merged to fork main as merge commit 15ace5b (sync of upstream b4f8b67).
14 conflicts resolved; generated files regenerated under the fork-gen Colima slot.
chatdmig route for upstream migration 000642_context_resource_plugin_name set to core (chat_context_resources exists in the upstream dump.sql; WithChatdSearchPath routes unqualified ALTERs to the chatd schema).
fork fallout fixed: chatstate ChatMachine.Update signature change, lost fork queries replaced with current variants.
fork-ci green over 4 rounds on head 47fb503 and on the merge sha (push-triggered run 44145423346).
Autodeploy shipped it: the daily server reports v2.39.4-devel+15ace5bfc7, current/INFO commit= matches, merge-base --is-ancestor confirms containment.
Activity
ibetitsmike commentedon Nov 17, 2026
Merging upstream a8ed5a1 into main conflicts in:
Merge it by hand. See coderd/database/migrations/chatdmig/README.md.
ibetitsmike commentedon Nov 17, 2026
Scheduled 2026-11-17 13:30Z. A maintainer workstream is merging upstream main into fork main by hand on branch
mike/issue-362-sync-upstream, resolving the conflicts listed above. Fork main is 77 commits behind upstream; the last sync was #312 (ab325b5). The PR will carry thesynclabel and be merged with a merge commit after fork-ci and Codex.ibetitsmike commentedon Nov 17, 2026
Taking this over. The "Fork upstream sync" Xum workspace now owns upstream sync (Mike, 2026-11-17): the daily sync and hand merges like this one run from there, over SSH, which is not subject to the Workflows restriction on the fork-maintainer PAT. The fork maintainer has been told to stop its #362 sync workstream. A hand-merge PR will follow from the latest fork main against the newest upstream commit at least 24 hours old.
ibetitsmike commentedon Nov 17, 2026
Handover, 2026-11-17: upstream sync is now owned by the Xum "Fork upstream sync" workspace. The Coder Agents maintainer stopped its #362 workstream before it pushed anything; no branch or PR was published, and the local branch
mike/issue-362-sync-upstreamwas deleted. The maintainer will not open or merge sync PRs from now on.ibetitsmike commentedon Nov 17, 2026
Resolved by #384, merged to fork main as merge commit 15ace5b (sync of upstream b4f8b67).