Origin
docs/ROADMAP.md §4 ("Current sprint — the smallest set that flips half the table") closing lines:
After S1–S5 land, the roadmap's next sprint takes up Stage 5 (IPC + Chapel + Tier-4 CI) and Stage 8 begins in parallel.
And the Stage-5 row in the 8-stage map:
Stage 5 Distributed & fast scale + specialised hardware 5a Cap'n Proto IPC Rust ↔ Julia, :8090 5b Chapel full integration dispatch.rs picks by config 5c coprocessor abstraction trait + tensor/vector/QPU/FPGA 5d Tier-4 live-CI provisioning 19 backends, Containerfile path
Scope (meta-tracker for the Stage 5 launch wave)
This is the umbrella tracker for the Stage 5 "next sprint" after S1-S5. The four constituent rows are tracked separately or already partially landed:
- 5a Cap'n Proto IPC — tracker roadmap: Cap'n Proto IPC schema finalisation (Stage 5a — OWNER-GATED, needs Opus sign-off) #194 (OWNER-GATED on Opus schema sign-off)
- 5b Chapel full integration — partially landed (L2.1 + L2.2 in main; L2.3+ gated on 5a per L1 Cap'n Proto dependency); cancel-token preemption tracked in the L2.3 issue (companion file)
- 5c Coprocessor abstraction — not yet trackered; trait + tensor/vector/QPU/FPGA pluggable backends
- 5d Tier-4 live-CI provisioning — 19 backends to provision via Containerfile path; references
Containerfile.full(issue Containerfile.full claims "all tier 1-4 provers" but ships only Z3/Agda/Lean/Metamath #11 closed-already on Tier-1-4 claim drift)
OWNER-GATED — Opus must sign off on:
- Cap'n Proto schema (5a precondition)
- Coprocessor abstraction trait shape (5c precondition)
- Tier-4 Containerfile budget for runner CI minutes (5d precondition)
Dependencies
- S1-S5 (sprint commitments) — all currently shown as ✓ done in ROADMAP §4 except S2 (hardware step still pending)
- roadmap: Cap'n Proto IPC schema finalisation (Stage 5a — OWNER-GATED, needs Opus sign-off) #194 Cap'n Proto IPC schema (5a, OWNER-GATED)
- Companion L2.3 cancel-token tracker (5b L2.3, GATED on 5a)
- No upstream blocker beyond the Opus-side design
Why filed
To make the cross-cutting "Stage 5 launch" commitment trackable as a single coordination point. Today the phrase "the roadmap's next sprint takes up Stage 5" lives only as a single sentence; this gives the four rows a place to coordinate completion and lets the owner mark the wave done when 5a + 5b + 5c + 5d all close.
Activity
hyperpolymath commentedon Sep 30, 2026
RULING D148 (2026-09-30T14:14Z) · scope: repo · basis: owner (direct answer, selector)
Sign off the three Stage 5 preconditions TOGETHER (Cap'n Proto IPC schema, coprocessor trait shape, Tier-4 CI minutes budget); #194 folds into #195; Stage 5a starts only after
surface: metadatastician/standards#787 (comment)
The open question in this issue is answered by the ruling above; future agents should act on it rather than re-ask.