Skip to content

chore: release v0.21.0#241

Merged
zeitlinger merged 2 commits intomainfrom
release-plz-2026-04-27T12-13-10Z
Apr 27, 2026
Merged

chore: release v0.21.0#241
zeitlinger merged 2 commits intomainfrom
release-plz-2026-04-27T12-13-10Z

Conversation

@github-actions
Copy link
Copy Markdown
Contributor

Added

  • add flint setup preflight migrations (#233)
  • support managed linter configs and aqua-backed tool keys (#228)
  • switch xmloxide to github backend (#229)
  • add taplo formatter check (#224)
  • (init) configure line length during init (#218)

Fixed

  • support renovate v43.136.3 (#223)
  • switch yaml-lint to ryl (#226)
  • (ruff) install via github releases (#227)
  • resolve init rollout regressions (#220)

Other

  • reduce fake-bin fixture coverage (#240)
  • (deps) update dependency npm:renovate to v43.141.1 (#221)
  • guard fixture case groups (#238)
  • (deps) update dependency grafana/flint to v0.20.4 (#235)
  • (deps) lock file maintenance (#237)
  • (deps) update dependency mise to v2026.4.19 (#236)
  • (deps) update rust crate json5 to v1 (#232)
  • (deps) update taiki-e/install-action digest to 787505c (#219)
  • (deps) update dependency grafana/flint to v0.20.3 (#225)

Important

Close and reopen this PR to trigger CI checks.

@github-actions github-actions Bot requested a review from a team as a code owner April 27, 2026 12:13
Signed-off-by: Gregor Zeitlinger <[email protected]>
@zeitlinger zeitlinger changed the title chore: release v0.20.5 chore: release v0.21.0 Apr 27, 2026
@zeitlinger zeitlinger enabled auto-merge (squash) April 27, 2026 12:16
@zeitlinger zeitlinger merged commit feab606 into main Apr 27, 2026
13 checks passed
@zeitlinger zeitlinger deleted the release-plz-2026-04-27T12-13-10Z branch April 27, 2026 12:26
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant