Skip to content

Conversation

@sapk
Copy link
Member

@sapk sapk commented Oct 26, 2017

Backport of #2266 and two little fixes related to this PR #2467 #2663

sapk and others added 3 commits October 26, 2017 22:52
* Only require one email (possibly not yet validated)

* Update message error and check validation of commit

* Add integrations tests

* Complete integration for import

* Add pre-check/optimization

* Add some test (not finished)

* Finish

* Fix fixtures

* Fix typo

* Don't guess key ID
…o-gitea#2663)

* GPG key email verification no longer case sensitive (go-gitea#2661)

* case insensitive GPG key email verification now cached (go-gitea#2661)

Signed-off-by: Julian Scholle <[email protected]>
@sapk sapk changed the title Backport to v1.2 of PR 2266 2467 Backport to v1.2 of PR 2266 2467 2663 Oct 26, 2017
@lafriks lafriks added this to the 1.2.3 milestone Oct 26, 2017
@lafriks
Copy link
Member

lafriks commented Oct 26, 2017

LGTM

@tboerger tboerger added the lgtm/need 1 This PR needs approval from one additional maintainer to be merged. label Oct 26, 2017
@lunny
Copy link
Member

lunny commented Oct 27, 2017

LGTM

@tboerger tboerger added lgtm/done This PR has enough approvals to get merged. There are no important open reservations anymore. and removed lgtm/need 1 This PR needs approval from one additional maintainer to be merged. labels Oct 27, 2017
@lunny lunny merged commit 357d5a5 into go-gitea:release/v1.2 Oct 27, 2017
@sapk sapk deleted the backport-2266-2467 branch October 27, 2017 06:42
@go-gitea go-gitea locked and limited conversation to collaborators Nov 23, 2020
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

lgtm/done This PR has enough approvals to get merged. There are no important open reservations anymore. type/bug

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants