You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
CI: Expire PR artifacts sooner and cancel superseded CI runs #615
@hannesa2, Two small things in BuildPR.yml - both your call since it also builds releases.
No retention-days on the four upload-artifact steps, so PR builds (~21 MB a run)
are kept the full 90 days, same as releases.
I suggest we keep these for just a week or two:
No concurrency group - a (second) push to a PR-branch starts an extra full matrix-build
instead of replacing the running one.
We can set this to be keyed on the PR number, with a fallback so master and tag builds are never cancelled:
Activity
hannesa2 commentedon Sep 12, 2026
Go ahead
Stop keeping pull request builds as long as releases (issue #615)