Repository navigation
Fix stale daily-go-test-parallelizer prompt tests - #78194
Conversation
Align assertions with intentional workflow changes from #78084 (terminal safe-output wording) and #78166 (extra validation log directory in the cache provisioning step) without weakening their intent. Co-authored-by: Copilot App <[email protected]>
|
✅ Ponytail Reviewer completed successfully! Ponytail ReviewerOutcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
✅ Design Decision Gate 🏗️ completed the design decision gate check. See the comment below for the result and any generated ADR draft. Design Decision Gate 🏗️Outcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
✅ Test Quality Sentinel completed test quality analysis. Test Quality SentinelOutcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
🧠 Matt Pocock Skills Reviewer has completed the skills-based review. ✅
|
|
✅ PR Specification Reviewer completed successfully! PR Specification ReviewerOutcome: The agent completed and reported one or more actions. The no-op output is a completion signal, not a claim that no action was taken. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
✅ PR Code Quality Reviewer completed the code quality review. PR Code Quality ReviewerOutcome: The agent completed and reported one or more actions. The no-op output is a completion signal, not a claim that no action was taken. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
There was a problem hiding this comment.
🟢 Approval recommended
The test updates align with the revised workflow prompt and cache-provisioning behavior, validating both required directories while preserving support for additional ones.
No open issues 🎉
What changed in this PR
Updates stale tests for the daily Go test parallelizer to match intentional workflow prompt and cache-provisioning changes.
Changes:
- Matches the revised terminal safe-output instruction.
- Validates both required Go cache directories while allowing additional provisioning directories.
- Leaves the workflow Markdown and generated lock file unchanged.
| File | Description |
|---|---|
| pkg/workflow/prompts_test.go | Updates prompt matching and disposable Go cache provisioning assertions for the current parallelizer workflow. |
Review effort: Lite (dynamic)
|
🎉 This pull request is included in a new release. Release: |
The
impacted-go-testscheck is failing on main and on unrelated PRs that touchpkg/workflow(for example #78184). Two tests inpkg/workflow/prompts_test.gobroke after intentional workflow changes and were never updated.TestDailyGoTestParallelizerUsesCodexCompatibleModel: Add completion and stop rules to Go test parallelizer #78084 reworded the instruction to "Call exactly one terminal safe-output tool". The test now checks for that sentence, so a terminal safe-output instruction is still required.TestDailyGoTestParallelizerProvisionsDisposableGoCaches: Fix Go parallelizer validation fixtures and failure diagnostics #78166 added/tmp/gh-aw/agent/parallelizer-validationto the provisioningmkdirstep because validation logs are now saved there. Previously the test compared the exact command string. It now requires amkdir -pstep that creates bothgo-build-cacheandgo-mod-cache, and allows extra directories.The workflow
.mdand lock file are unchanged.Validation:
go test ./pkg/workflow -run 'TestDailyGoTestParallelizer' -count=1passes, andmake fmtandgo vet ./pkg/workfloware clean.