Repository navigation
Add completion and stop rules to Go test parallelizer - #78084
Conversation
Co-authored-by: copilot-swe-agent[bot] <[email protected]>
|
✅ PR Specification Reviewer completed successfully! PR Specification ReviewerOutcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
✅ Ponytail Reviewer completed successfully! Ponytail ReviewerOutcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
✅ PR Code Quality Reviewer completed the code quality review.
|
|
✅ Design Decision Gate 🏗️ completed the design decision gate check. See the comment below for the result and any generated ADR draft. Design Decision Gate 🏗️Outcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
|
🧠 Matt Pocock Skills Reviewer has completed the skills-based review. ✅
|
|
✅ Test Quality Sentinel completed test quality analysis. Test Quality SentinelOutcome: The agent completed and reported no action. A no-op output alone does not verify that all required work was completed or that publication was possible. Agent messages are omitted from this comment. The category uses structured run status, not interpretation of agent prose.
|
There was a problem hiding this comment.
🔵 Needs a closer look
The checkpoint coordinates Go validation, rollback, and terminal reporting under hard execution limits, requiring human review and scheduled-run evidence to confirm reliable report_incomplete output before cutoff.
No open issues 🎉
What changed in this PR
Updates the daily Go Test Parallelizer’s workflow instructions to limit incomplete runs and improve outcome reporting, addressing #78065.
Changes:
- Adds a turn/time checkpoint and early stopping after policy denials or unrecoverable tool failures.
- Defines completion criteria for no-change outcomes, validated draft PRs, and incomplete results.
- Requires evidence-based failure classification and refreshes generated workflow hashes.
| File | Description |
|---|---|
.github/workflows/daily-go-test-parallelizer.md |
Adds stop rules, completion criteria, and clearer failure reporting while preserving validation and cursor safeguards. |
.github/workflows/daily-go-test-parallelizer.lock.yml |
Updates metadata and admission hashes to match the revised workflow prompt. |
Review effort: Balanced (dynamic)
Align assertions with intentional workflow changes from #78084 (terminal safe-output wording) and #78166 (extra validation log directory in the cache provisioning step) without weakening their intent. Co-authored-by: Copilot App <[email protected]>
|
🎉 This pull request is included in a new release. Release: |
The daily Go Test Parallelizer had repeated incomplete runs and high token usage. Its incomplete reports could label suspected restrictions as policy blocks without evidence.
nooponly after assessing every selected file and finding no safe edits; create a draft PR only after required tests and diff checks pass; report all partial or uncertain outcomes as incomplete.