Repository navigation
feat: add pre-mortem step to plan-eng-review - #592
jojoprison wants to merge 1 commit into
Conversation
Add Step 0 (Pre-mortem) before Scope Challenge: "It's 3 months later and this plan failed. Top 3 reasons?" Forces inversion thinking before reviewing plan logic. Existing Scope Challenge becomes Step 0.1. Inspired by pre-mortem technique from structured plan stress-testing. Co-Authored-By: Claude Opus 4.6 (1M context) <[email protected]>
|
Nice addition — pre-mortem is one of those techniques that's disproportionately high-value relative to the effort. One thought: the pre-mortem could naturally reinforce the two-axis scope distinction (#398). When people imagine failure modes, they tend to surface implementation gaps (missing error handling, no tests for edge case X, no monitoring) rather than product scope issues. Making that explicit — "are these failures from building too wide, or from building too shallow?" — could sharpen the output. Not suggesting scope creep on this PR, just noting the synergy. The 5-line version here is the right call — ship it and iterate. |
|
@16francej — recommend closing this PR. The change edits generated output, conflicts with current main, and duplicates the stronger failure-mode review already maintained in the canonical template. |
…arrytan#592 garrytan#696 garrytan#1523 garrytan#1053) Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
|
Thanks for the idea. /plan-eng-review already walks failure modes per code path and flags silent critical gaps, and this edits the generated file rather than the template, so we're closing it. |
Summary
Adds a Pre-mortem step (Step 0) before Scope Challenge in
/plan-eng-review:This forces inversion thinking — identifying failure modes from production reality before reviewing plan logic. The existing Scope Challenge becomes Step 0.1.
Why
Pre-mortem is a well-documented technique (Gary Klein, "Performing a Project Premortem", HBR 2007) that catches blind spots traditional plan review misses. By imagining the plan has already failed, reviewers shift from "does this look reasonable?" to "what specifically will break?" — surfacing concrete risks like data loss, performance cliffs, or team confusion.
What changes
plan-eng-review/SKILL.md: New Step 0 (Pre-mortem) with 3-failure-mode promptBoil the Lake score
This is a ~5-line addition that makes every subsequent plan review more thorough. Completeness: 9/10.
🤖 Generated with Claude Code