Skip to content

plan(cluster) runs gc() on the worker for each future since 1.67.0 (default gc = TRUE) #852

Backlog

Description

@avehtari

Since future 1.67.0, plan(cluster) runs gc() on the worker before and after each future. With 2 local workers, value(future(1)) takes about 310 ms with plan(cluster) and about 45 ms with plan(multisession), a factor of about 7. With ggplot2, dplyr, Matrix and lme4 loaded on the workers (44 namespaces per worker), plan(cluster) takes about 555 ms.

Is gc = TRUE the intended default for plan(cluster)? The NEWS.md of 1.67.0 does not mention this change, and it is possible that is not intended. ClusterFutureBackend() has the default gc = TRUE. MultisessionFutureBackend() has gc = FALSE. In 1.58.0, cluster() had the argument gc = FALSE, so plan(cluster) did not run gc(). In 1.67.0 and in the development version (1.82.0-9036), cluster() has no gc argument, so the default of the backend applies.

With gc = TRUE, launchFuture.ClusterFutureBackend() calls gc() on the worker before the future, and receiveMessageFromWorker() calls gc() on the worker again after the result.

Here's an example code

library(future)
ms_per_future <- function(n = 20) {
  invisible(value(future(1)))
  t0 <- proc.time()[["elapsed"]]
  for (i in seq_len(n)) value(future(1))
  1000 * (proc.time()[["elapsed"]] - t0) / n
}

plan(cluster, workers = 2)
ms_per_future()
# ms per future: 304 to 315

plan(cluster, workers = 2, gc = FALSE)
ms_per_future()
# ms per future: 45

plan(multisession, workers = 2)
ms_per_future()
# ms per future: 45

plan(multisession, workers = 2, gc = TRUE)
ms_per_future()
# ms per future: 300 to 319

# Workers with ggplot2, dplyr, Matrix and lme4 loaded (44 namespaces per
# worker in the runs below; install these packages first):
plan(sequential)
cl <- parallelly::makeClusterPSOCK(2)
invisible(parallel::clusterCall(cl, function() {
  for (p in c("ggplot2", "dplyr", "Matrix", "lme4")) loadNamespace(p)
}))
plan(cluster, workers = cl)
ms_per_future()
# ms per future: 554 to 558

plan(cluster, workers = cl, gc = FALSE)
ms_per_future()
# ms per future: 45

plan(sequential)
parallel::stopCluster(cl)

Code that makes many small futures on a cluster runs slower. For example, In the test suite of the projpred package, the parallel tests took 566 s with the default and 174 s with gc = FALSE.

gc = FALSE as the default of ClusterFutureBackend() would restore the behavior of 1.58.0.

If gc = TRUE is intended, it would be good to mention it in NEWS.md and in ?cluster

Thanks for maintaining future!

Activity

  1. added this to the Next release milestone on Nov 28, 2026
  2. HenrikBengtsson commented on Nov 28, 2026

    @HenrikBengtsson
    Collaborator

    Thanks for reaching out and the detailed troubleshooting. I just checked, and yes, the move from gc = FALSE to gc = TRUE by default was a mistakes - it became the new default through some unlucky set of edits. I think I made the same mistake for earlySignal, but that I detected and fixed. I'll make sure to revert back to gc = FALSE in the next release.

    In future 1.69.0, I removed gc and earlySignal from the future() functions and to only allow them in the plan() setup, but eventually remove them from there too. I know people use gc, so that is harder to deprecate, but plan(..., earlySignal = ...) is already deprecated. You post reminded me about this plan - thanks.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions