Skip to content

chore: tidy docs, pins and leftover assets #124

Open

Description

@uniqueg

Problem

Small leftovers of the 0.1.0 pre-release review (findings L15-L18), not covered by other issues:

  • User guide: "Copy access token" (sidebar menu) isn't documented, nor that the copied token works at every TES and WES that accepts the login provider's tokens until it expires (docs/user-guide/index.md). (Naming the login provider generically is part of feat!: remove LS Login values from examples #115.)
  • Development guide: asks for "a recent" Bun and bun i (docs/development/index.md), while packageManager pins [email protected] and CI checks that version; it should say so and use bun install --frozen-lockfile.
  • Reproducibility:
    • the Playwright image of the e2e jobs is pinned by tag only (mcr.microsoft.com/playwright:v1.56.1-noble in .github/workflows/ci.yml), not by digest;
    • docs/requirements.txt pins only the top-level packages, so transitive ones float between docs builds;
    • next/font/google downloads the fonts at build time, so an image build needs network access to Google Fonts and can change when the fonts change.
  • NOTICE: the image now ships NOTICE (fix: send security response headers #120). Not checked yet: whether the fonts' OFL notices reach the image, and whether public/ls-login-grey-wide.jpg needs an entry (moot if feat!: remove LS Login values from examples #115 removes the file).
  • Unused asset: public/next.svg is referenced nowhere.

Expected

  • The user guide documents "Copy access token" with a warning about where the token is valid.
  • The development guide names Bun 1.4.4 (or "the version in packageManager") and the frozen install.
  • The Playwright image is pinned by tag and digest (Dependabot keeps both current), and the docs dependencies are fully pinned, e.g. with a lock file generated from the top-level list, as in the organization's other docs builds.
  • The fonts are either self-hosted (next/font/local, with their licence files and a NOTICE entry) or the build's network need is documented.
  • public/next.svg is deleted.
  • Lint, unit, e2e and the strict docs build pass; light lane except the font change, which touches the build.

Activity

  1. added
    priority: low
    type: maintenance
    workload: hours
    status: triage
    on Nov 19, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    priority: lowstatus: triagetype: maintenanceworkload: hours

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions