Skip to content

D4.3: Standards for describing workflow and tool inputs and outputs using / complementing bio.tools and WorkflowHub #82

Open
0 of 2 issues completed

Description

@uniqueg

D4.3 · Owner: @uniqueg · Due: end of December 2026

Wording

Standards for describing workflow and tool inputs and outputs using / complementing bio.tools and WorkflowHub

Status in the WP4 sprint plan (the Demonstrator dashboard was discontinued; Krini replaces it)

  • Done: ✅ Drafted proposal and JSON Schema-based meta-schema specification / ✅ Shared with GA4GH to consider as candidate product
  • To do (❗ required, ⭐ nice to have): ⭐ Acceptance as GA4GH candidate product / ⭐ Integrate into Krini

Required (sub-issues)

Done when

All required items are closed. The report is the evidence; it links to the closed issues and deployed services.


Part of the ELIXIR Compute Platform WP4 sprint (M&Ds due end of December 2026).
If you want to work on this issue:

  • Assign yourself (if someone is already assigned, ask them first or pick another one)
  • Move the issue to "In progress" on the project board
  • Start working 🚀

Sub-issues

Sub-issues

0 of 2 Issues completed
Loading 2 sub-issues

Activity

  1. self-assigned this
    on Nov 8, 2026
  2. added
    priority: high
    type flag: meta
    workload: weeks
    ecp-wp4: D4.3
    on Nov 8, 2026
  3. uniqueg commented on Nov 8, 2026

    @uniqueg
    MemberAuthor

    Spirit and nice to have for D4.3: listed for overview only. These issues are not required for D4.3, not sub-issues and not task-list items; this issue can be closed without them. They sit in the Backlog of the project board with the label flag: nice to have (test-bed items stay on their own boards).

  4. moved this from Backlog to Tracking in ELIXIR On-Cloudon Nov 8, 2026
  5. moved this to Tracking in ELIXIR On-Cloudon Nov 8, 2026
  6. uniqueg commented on Nov 12, 2026

    @uniqueg
    MemberAuthor

    The end-to-end demonstration of the GA4GH I/O Schema for D4.3 (TRS-Filer → generated form in Krini → WES on Conquest) is tracked in elixir-cloud-aai/ga4gh-io-schema#23, next to the profile's v0.3 work, and on the project board BioHackEU26: GA4GH I/O Schema. Everything I/O Schema is tracked in uniqueg/ga4gh-io-schema, so it is linked here instead of being a sub-issue.

  7. added
    type: delivery
    on Nov 13, 2026
  8. added
    status: triage
    and removed on Nov 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

ecp-wp4: D4.3priority: highstatus: triagetype flag: metatype: deliveryworkload: weeks

Type

No type

Projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions