M4.4: ELIXIR On-Cloud is available for (selected) ELIXIR users to run workflows in different languages and individual containerised tasks #43

Open
4 of 10 issues completed

Description

@uniqueg

M4.4 · Owner: @uniqueg · Due: end of December 2026

Wording

ELIXIR Cloud is available for (selected) ELIXIR users to run workflows in different languages and individual containerised tasks

Status in the WP4 sprint plan (the Demonstrator dashboard was discontinued; Krini replaces it)

  • Done: ✅ Krini deployed / ✅ WESkit deployed / ✅ Conquest implemented / ✅ proTES gateway deployed / ✅ TES network deployed (see M4.1)
  • To do (❗ required, ⭐ nice to have): ❗ Deploy Conquest / ❗ Add support to Krini for running WES workflows via WESkit and/or Conquest / ❗ Add LS Login support to Krini / ❗ Enforce basic OAuth2-based access control from client at least to the gateway

Backend authorization beyond the gateway is nice to have: the sprint plan asks for access control "from client at least to the gateway".

Required (sub-issues)

Done when

All required items are closed. The report is the evidence; it links to the closed issues and deployed services.


Part of the ELIXIR Compute Platform WP4 sprint (M&Ds due end of December 2026).
If you want to work on this issue:

  • Assign yourself (if someone is already assigned, ask them first or pick another one)
  • Move the issue to "In progress" on the project board
  • Start working 🚀

Sub-issues

Sub-issues

4 of 10 Issues completed
Loading 10 sub-issues

Activity

  1. added
    priority: high
    type flag: meta
    type: delivery
    workload: weeks
    ecp-wp4: M4.4
    on Nov 8, 2026
  2. self-assigned this
    on Nov 8, 2026
  3. changed the title [-]M4.4: workflows and tasks for ELIXIR users[/-] [+]M4.4: ELIXIR On-Cloud is available for (selected) ELIXIR users to run workflows in different languages and individual containerised tasks[/+] on Nov 8, 2026
  4. removed
    type: delivery
    on Nov 8, 2026
  5. uniqueg commented on Nov 8, 2026

    @uniqueg
    MemberAuthor

    Spirit and nice to have for M4.4: listed for overview only. These issues are not required for M4.4, not sub-issues and not task-list items; this issue can be closed without them. They sit in the Backlog of the project board with the label flag: nice to have (test-bed items stay on their own boards).

  6. 2 remaining items

  7. moved this to Backlog in ELIXIR On-Cloudon Nov 8, 2026
  8. moved this from Backlog to Tracking in ELIXIR On-Cloudon Nov 8, 2026
  9. moved this to Tracking in ELIXIR On-Cloudon Nov 8, 2026
  10. added
    type: delivery
    on Nov 13, 2026
  11. added
    status: triage
    and removed on Nov 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

ecp-wp4: M4.4priority: highstatus: triagetype flag: metatype: deliveryworkload: weeks