M4.3: Automatic upgrading system in place #41

Open
1 of 6 issues completed
Open

Description

@uniqueg

M4.3 · Owner: @uniqueg · Due: end of December 2026

Wording

Automatic upgrading system in place

Status in the WP4 sprint plan (the Demonstrator dashboard was discontinued; Krini replaces it)

  • Done: ✅ Central roadcasting service implemented / ✅ Sidecar upgrade service implemented
  • To do (❗ required, ⭐ nice to have): ❗ Deploy (central service and two or more sidecars) / ❗ Test / ❗ Roll out for TES service deployment upgrades / ⭐ Integrate into consolidated elixir-on.cloud web presence

Required (sub-issues)

Done when

All required items are closed. The report is the evidence; it links to the closed issues and deployed services.


Part of the ELIXIR Compute Platform WP4 sprint (M&Ds due end of December 2026).
If you want to work on this issue:

  • Assign yourself (if someone is already assigned, ask them first or pick another one)
  • Move the issue to "In progress" on the project board
  • Start working 🚀

Sub-issues

Sub-issues

1 of 6 Issues completed
Loading 6 sub-issues

Activity

  1. added
    priority: high
    type flag: meta
    type: delivery
    workload: weeks
    ecp-wp4: M4.3
    on Nov 8, 2026
  2. self-assigned this
    on Nov 8, 2026
  3. changed the title [-]M4.3: automatic upgrades of TES deployments[/-] [+]M4.3: Automatic upgrading system in place[/+] on Nov 8, 2026
  4. removed
    type: delivery
    on Nov 8, 2026
  5. uniqueg commented on Nov 8, 2026

    @uniqueg
    MemberAuthor

    Spirit and nice to have for M4.3: listed for overview only. These issues are not required for M4.3, not sub-issues and not task-list items; this issue can be closed without them. They sit in the Backlog of the project board with the label flag: nice to have (test-bed items stay on their own boards).

  6. moved this from Backlog to Tracking in ELIXIR On-Cloudon Nov 8, 2026
  7. moved this to Tracking in ELIXIR On-Cloudon Nov 8, 2026
  8. added
    type: delivery
    on Nov 13, 2026
  9. added
    status: triage
    and removed on Nov 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

ecp-wp4: M4.3priority: highstatus: triagetype flag: metatype: deliveryworkload: weeks