You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
End-to-end test and rollout of automatic TES upgrades via Pubgrade #33
M4.3 is only demonstrably "in place" once a real upgrade propagates automatically from one published release to TES deployments at several Nodes. The upgrade is orchestrated: one trigger, concurrent delivery, and all sites on the same image digest within minutes, with the gap measured.
How?
Rehearse with a test tag on tesk-api; its CI publishes the image and calls Pubgrade once.
Test failure paths: an unreachable sidecar, and a bad image (there's no rollback: what does an operator do?).
Publish the real release (tesk-api v1.2.0). Verify that each subscribed sidecar is notified and that each deployment rolls out to the same digest. Then verify the upgraded service by running a test task on each site, optionally via proTES.
File bugs found during testing in the Pubgrade or Pubgrade-Sidecar repos and link them here.
Write a short report (steps, timings, logs) to use as evidence for the M4.3 milestone. It says what the demonstration doesn't show, e.g., only tesk-api is upgraded, and only on Kubernetes.
Acceptance criteria
One published release triggers successful, verified upgrades on at least two Nodes.
Moved here from elixir-cloud-aai/Pubgrade: the service repos stay generic and easy to deploy anywhere, so issues about specific deployments live in generic-issues.
Activity
uniqueg commentedon Nov 8, 2026
Moved here from elixir-cloud-aai/Pubgrade: the service repos stay generic and easy to deploy anywhere, so issues about specific deployments live in generic-issues.