Skip to content

docs: fill the gaps in the Node Operators pages #81

Closed
1 of 1 issue completed
Closed

Description

@uniqueg

Problem

The rewrite of the Node Operators section (#64, PR #79) left "Under construction" notes where the facts aren't in the repositories or the old pages. They need input from the maintainers of the deployment:

  1. Policies for joining the federation: who can join, what a Node must provide, how long verification takes.
  2. How admins verify a registered TES service, and which services of the deployment use the verified entries (e.g. whether the deployment's proTES reads them).
  3. The vsftpd federation account (user name and password): currently "write to the service email".
  4. Addresses, plugins and registry of the deployment's proTES; addresses and contents of proWES, CWL-WES (which TES it uses), DRS-Filer and TRS-Filer.
  5. How Poiesis is used in the deployment (which Nodes, which storage).
  6. Funnel with OpenPBS: the pages document Slurm only.

Proposal

The maintainers answer the questions (here or in the PR); the pages then replace the "Under construction" notes with the facts.

Part of #61.

Sub-issues

Sub-issues

1 of 1 Issues completed
Loading 1 sub-issues

Activity

  1. added
    priority: medium
    status flag: need info
    status: triage
    type: docs
    workload: hours
    on Nov 1, 2026
  2. added
    ecp-wp4: D4.5
    on Nov 8, 2026
  3. added
    status: in progress
    and removed
    status: triage
    on Nov 13, 2026
  4. self-assigned this
    on Nov 13, 2026
  5. moved this from Backlog to In progress in ELIXIR On-Cloudon Nov 13, 2026
  6. 3 remaining items

  7. moved this from In progress to In review in BioHackEU26: Miscellaneouson Nov 13, 2026
  8. moved this from In review to Backlog in ELIXIR On-Cloudon Nov 16, 2026
  9. added
    status: triage
    status: in progress
    and removed
    status: in progress
    status flag: need info
    status: triage
    on Nov 16, 2026
  10. moved this from Backlog to In progress in ELIXIR On-Cloudon Nov 17, 2026
  11. moved this from In progress to In review in ELIXIR On-Cloudon Nov 17, 2026
  12. moved this from In review to Done in ELIXIR On-Cloudon Nov 17, 2026
  13. removed
    status: in progress
    on Nov 17, 2026
  14. moved this from In review to Done in BioHackEU26: Miscellaneouson Nov 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

ecp-wp4: D4.5priority: mediumtype: docsworkload: hours

Type

No type

Projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions