Backlog
0 / 30 of 3 issues completedLabels
ecp-wp4: D4.4ELIXIR Compute Platform WP4 milestone/deliverable this issue contributes toecp-wp4: D4.5ELIXIR Compute Platform WP4 milestone/deliverable this issue contributes toecp-wp4: D4.6ELIXIR Compute Platform WP4 milestone/deliverable this issue contributes topriority: highHigh prioritystatus: triageHas not been triaged by admintype: docsImprovements or additions to documentationworkload: daysLikely takes days to resolve
Description
The Documentation Hub has no releases, and that's fine, but it means it never gets the pre-release review our software gets. The pages have grown page by page and sprawl a little: structure, language and feel differ between sections.
Before the docs deliverables D4.4, D4.5 and D4.6 are done, review and clean up the hub, section by section, as a pre-release review would:
- Structure: intuitive navigation per audience; every page has one purpose; no duplicates; nothing orphaned.
- Language: simple, clear, consistent terms (one name per thing), short sentences.
- Feel: consistent page layout (intro, prerequisites, steps, what's next); admonitions, code blocks and tables used the same way everywhere.
- Correctness: every statement checked against its source; no stale or contradicting statements.
One sub-issue per deliverable section; this issue covers the cross-cutting parts (start page, navigation, glossary, shared style rules, a short style guide for contributors).
Done when: all sub-issues are closed, the cross-cutting parts are done, and the strict build and link check pass.
Sub-issues
Collapse Sub-issuesSub-issues
Loading 3 sub-issues
Metadata
Metadata
Assignees
Labels
ecp-wp4: D4.4ELIXIR Compute Platform WP4 milestone/deliverable this issue contributes toecp-wp4: D4.5ELIXIR Compute Platform WP4 milestone/deliverable this issue contributes toecp-wp4: D4.6ELIXIR Compute Platform WP4 milestone/deliverable this issue contributes topriority: highHigh prioritystatus: triageHas not been triaged by admintype: docsImprovements or additions to documentationworkload: daysLikely takes days to resolve
Type
Projects
- StatusShow more project fieldsBacklog
Activity