Skip to content

Verify package completeness, migration, and release readiness #15

Open

Description

@egdev6

Goal

Verify package completeness from an immutable commit after approved delivery, review the SemVer migration, and assess release readiness.

Observations

  • The release workflow auto-publishes on a version-changing push to main and idempotently skips an existing tag.
  • A release candidate is recommended until real integration exists; the version stays undecided pending human SemVer migration review.
  • package.json is 1.1.0 and unchanged; no release approval value exists here (a bootstrap apply hash is not a release approval).

Decision gate

Approve package completeness and the SemVer migration review. A tag or release happens after the block closes, never as a prerequisite, so this is not a circular gate.

Acceptance criteria

  • The package from an immutable commit contains all newly approved assets and skills.
  • SemVer migration review is documented with the decision and its open risks.
  • Current auto-publish behavior is documented honestly; any future version or push approval explicitly includes the resulting auto-release or gates the publishing change first.
  • No CD change is made in this unit.

Verification

  • Dry run from an immutable commit -> package builds, contains declared skills and assets, no credentials in output.
  • Review record -> baseline version, compatibility decision, and open risks.

Release checkpoint

Remaining risk: the version is undecided and no release authority exists. A release candidate is recommended, not mandated.

Tracking

Roadmap item: B01-03. All acceptance criteria remain pending; publication does not grant approval or release authority.

Dependencies

Activity

  1. added
    type:choreMaintenance, tooling, or automation change
    on Oct 8, 2026
  2. egdev6 commented on Oct 10, 2026

    @egdev6
    OwnerAuthor

    ODD reconciliation: complete package, migration and release readiness

    Full scope and boundaries

    Include every newly approved skill/asset and the associated behavior, validation, migration and documentation commitments. Packaging inert assets alone does not establish supported activation or fulfill those commitments.
    The injected plan API is a separate feature candidate, not a new package prerequisite. Its separation does not discard existing lifecycle, project-sync or branch-protection closure obligations.
    Exclude CD changes, live credentials/secrets, blanket Projects/token/sandbox/agent-load claims, automatic label migration, resource deletion and implementation/release authority granted merely by this plan.

    Retained acceptance criteria

    • The package from an immutable commit contains all newly approved assets and skills.
    • SemVer migration review documents the decision and open risks.
    • Current auto-publish behavior is documented honestly; any future version/push approval includes its resulting auto-release or gates the publishing change first.
    • No CD change is made in this unit.

    Current delivery versus remaining work

    Area Current evidence Remaining acceptance
    Approved advisory skills, safety guidance, lifecycle/project-sync assets and offline tests Merged delivery series #37–#48; current source tree Complete inventory and verification of promised behavior, not just package presence
    Native command transport and fixtures #47 transport and #48 fixture extraction are merged PRs. The existing minimal-config native CLI test uses the shared helpers; one new fixture guard also passes Enabled-family/native-discovery characterization is not proven by the historical suite alone; no public plan API is delivered
    Package and platforms Main 80feb7b; 64 regular source files; main CI, Node 20.20.2, Ubuntu 182 passed, macOS/Windows 180 passed +2 inherited skips Bind final package contents/security evidence to the accepted immutable candidate after all in-scope work
    Lifecycle Offline workflow tests delivered Defaults/canonical-label behavior; authorization-hash/preflight behavior; opt-out and legacy README behavior remain explicit completion obligations
    Project sync Offline renderer/runtime/guard cases delivered Fifteen remaining donor scenarios and the normalized adapter path; preserve the complete checklist during scoping rather than dropping tests
    Activation and closure Default-on/deferred policies are design decisions, not schema/runtime activation Validate wiring, migration and bounded deferred behavior; decide branch-protection closure boundary against #17 explicitly
    SemVer/release Package version remains 1.1.0. Actual main logs preserve its existing tag and skip existing GitHub Release creation Human compatibility/migration decision and open risks; future release/version remains separately authorized

    ODD phases

    Phase Result Validation Exit condition
    1. Acceptance inventory Map every approved asset/skill and retained behavior obligation to delivered source, evidence or an explicit blocker; reconcile #13/#14 Compare original bodies, immutable source and current evidence Human accepts a complete closure checklist, including boundary with #17/#18; no silent deferral or reduced assets-only scope
    2. Complete in-scope delivery Individually authorized cohesive units for remaining behavior/wiring/docs Functional tests and applicable test-first evidence; complete RAM measurement before any write; independent verification by risk Every retained obligation satisfied or a separately approved scope revision recorded, never disguised as completed
    3. Immutable package and migration review Final package manifest, security evidence, compatibility decision and honest auto-publish explanation Verify package bytes against the chosen immutable source and all declared skills/assets; review risks/platform limits Retained package/migration criteria accepted by the maintainer
    4. Readiness reconciliation Publish evidence of outcomes and unresolved risks Recheck dependencies, criteria and final CI Human decides issue/block closure separately; release remains a later action

    No release is a prerequisite for closing B01. A release candidate is recommended, not mandated; version/type stay undecided until human SemVer review. A bootstrap apply hash is not release consent.
    A complete unit must fit 400 additions+deletions before writing anywhere, including helpers/tests/docs and moves counted twice. If not, stop without trimming assertions, compressing code or hiding deferred payloads.

    Coordination

    This planning review neither assigns nor starts work. Recheck current assignees, claims and PR before explicit authorization for a unit. Preserve existing issue bodies/comments and evidence. The shared roadmap will link this verified review; until dependencies and closure scope are accepted, do not announce #15 as ready or complete.

  3. egdev6 commented on Oct 10, 2026

    @egdev6
    OwnerAuthor

    ODD review: offline branch protection and explicit workflow migration

    Issue: #15, dependencies #13 and #14.
    Supersedes the v2 ODD review for current planning and closure boundaries, retaining every original acceptance criterion and outstanding behavior commitment. Publication records the approved planning decision, not implementation or closure.

    Complete scope and decisions

    Verify the complete approved package from an immutable delivered commit and document human SemVer/migration decisions and open risks.
    #15 owns the branch-protection contract, product implementation and simulated/offline tests. #17 owns actual auth/apply verification in an approved sandbox. No live sandbox run is a prerequisite to close B01.
    Retain conditional default-on for lifecycle/project-sync workflows, with explicit opt-out, requirements and legacy compatibility review before implementation. Do not weaken stronger protection or bypass per-module decisions/final-SHA authorization.
    The plan API #49 remains separate and is not a prerequisite for #15. Exclude CD changes, credential creation, live target mutations, automatic legacy migration/deletion and release authority.

    Retained acceptance criteria

    • The package from an immutable commit contains all newly approved assets and skills.
    • SemVer migration review documents the decision and its open risks.
    • Current auto-publish behavior is documented honestly; future version/push approval includes its resulting auto-release or gates publishing first.
    • No CD change is made in this unit.

    Delivered foundations and remaining obligations

    • Three declared skills, workflow assets, pure renderer, functional offline VM tests and command transport/fixtures are delivered. Packaging inert assets does not establish activation.
    • Reuse delivered file hashes, authorization kernel, symlink preflight and fixed-template collision guards. They are not missing work.
    • Complete lifecycle defaults/canonical-label validation, workflow-specific source/destination hashing and preflight binding, opt-out preservation and README/example agreement.
    • Complete the fifteen outstanding project-sync scenarios and normalized-manifest adapter; retain delivered S13–S17 offline coverage. Add schema/normalization, discovery, plan/hash/install and bounded deferred behavior without silently dropping essential tests.
    • Complete branch-protection discovery/desired-state contract, plan/apply implementation and offline status/error/preservation tests. Stronger observed protection must remain unless an exact reviewed weakening diff receives separate approval.
    • New runtime fields remain invalid until their complete owned implementation is delivered; no accepted-but-unused flag scaffolding.

    ODD and verification

    Phase Outcome Exit condition
    Contract and migration Specify activation requirements, opt-out, legacy manifest changes and branch-protection semantics Human accepts complete compatibility/migration contract before Source implementation; no version selected or changed automatically
    Bounded delivery Cohesive, explicitly authorized runtime units with all tests/docs Whole proposed bodies measured in RAM before writing anywhere: at most 400 additions+deletions, including helpers/tests/docs and moves twice; stop on overflow without compression or omissions
    Final immutable candidate Package contents, source-byte identity, security/platform evidence and migration record All retained behavior and original criteria reviewed and accepted, not assets-only
    Readiness Reconcile outcomes and outstanding risks Human decides issue/block closure separately; release is later and not a closure prerequisite

    Use meaningful test-first evidence where applicable and independent verification by risk. Offline tests do not prove stored credentials, live Projects, sandbox security, agent loading or LLM behavior.
    No assignment, implementation, issue closure, version bump, tag/release, workflow run or cleanup is authorized by this review. Revalidate claims and related PR before any separately authorized start.

  4. reopened this on Oct 10, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    status:approvedApproved for implementationtype:choreMaintenance, tooling, or automation change

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests