Skip to content

Package PR builds and restore official test legs - #6236

Merged
hoyosjs merged 6 commits into
mainfrom
dev/max-charlamb/parallel-test-pipelines
Nov 17, 2026
Merged

hoyosjs merged 6 commits into
mainfrom
dev/max-charlamb/parallel-test-pipelines

Conversation

@max-charlamb

@max-charlamb max-charlamb commented Nov 13, 2026 •

Copy link
Copy Markdown
Member

Summary

Pipeline layouts

Pull request

+------------------------------------------------------+
| Build stage                                          |
|                                                      |
|  - Cross-platform product builds                     |
|  - Normal local and Helix test legs                  |
|  - Package / sign / publish                          |
+--------------------------+---------------------------+
                           |
                           v
+------------------------------------------------------+
| Prepare Release stage                                |
|                                                      |
|  - Build release tooling                             |
+------------------------------------------------------+

Official and other non-PR builds

                         +----------------------+
                         | Build stage          |
                         +----------+-----------+
                                    |
                    +---------------+---------------+
                    |                               |
                    v                               v
        +----------------------+       +--------------------------+
        | Normal Tests stage   |       | Package / Publish stage  |
        +----------------------+       +------------+-------------+
                                                   |
                                   +---------------+---------------+
                                   |                               |
                                   v                               v
                       +------------------------+       +------------------------+
                       | Installed Tests stage  |       | Validate Build Assets  |
                       +------------------------+       +-----------+------------+
                                                                  |
                                                                  v
                                                      +------------------------+
                                                      | Publish Using DARC     |
                                                      +-----------+------------+
                                                                  |
                                                                  v
                                                      +------------------------+
                                                      | Prepare Release stage  |
                                                      +------------------------+

Validation

  • Azure Pipelines preview expansion succeeded for the official pipeline
  • confirmed Build -> Normal Tests and Package / Publish
  • confirmed Package / Publish -> Installed Tests and Validate Build Assets
  • confirmed official expansion contains Release jobs only, even when Debug is requested

Max Charlamb added 4 commits November 12, 2026 19:05
Run standard tests in official builds and test the signed packaged tools in parallel with build asset validation. Add an assetless validation mode so test runs do not publish product assets.

Co-authored-by: Copilot <[email protected]>

Copilot-Session: 20509674-cc28-401c-a1fa-0f8dbe23d5f0
Avoid building and testing Debug configurations in official diagnostics runs while preserving existing PR and nonofficial matrices.

Co-authored-by: Copilot <[email protected]>

Copilot-Session: 20509674-cc28-401c-a1fa-0f8dbe23d5f0
Keep PR builds, tests, and packaging in one stage while running non-PR tests and packaging as parallel stages. Extract the shared packaging job and use one configuration policy across build and package jobs.

Co-authored-by: Copilot <[email protected]>

Copilot-Session: 20509674-cc28-401c-a1fa-0f8dbe23d5f0
Official runs now always register assets in BAR and publish through Darc. Remove the misleading validation-only parameter and its assetless publishing configuration.

Co-authored-by: Copilot <[email protected]>

Copilot-Session: 20509674-cc28-401c-a1fa-0f8dbe23d5f0
@max-charlamb max-charlamb changed the title Run official standard and packaged tests Package PR builds and restore official test legs Nov 13, 2026
Add the cross-compiled Linux ARM and musl ARM build legs to public PR builds so packaging receives the same eleven platform outputs as official builds.

Co-authored-by: Copilot <[email protected]>

Copilot-Session: 20509674-cc28-401c-a1fa-0f8dbe23d5f0
Comment thread diagnostics.yml Resolved
Comment thread diagnostics.yml Resolved
Comment thread diagnostics.yml Resolved
Comment thread eng/pipelines/tests-packaged-sos.yml Resolved
Comment thread diagnostics.yml Resolved
Reuse one local and Helix test-job template from both the PR build stage and non-PR test stage. Also use configuration-neutral package download step names.

Co-authored-by: Copilot <[email protected]>

Copilot-Session: 20509674-cc28-401c-a1fa-0f8dbe23d5f0
@hoyosjs
hoyosjs enabled auto-merge (squash) November 17, 2026 17:21
@hoyosjs
hoyosjs merged commit ed1be2b into main Nov 17, 2026
29 checks passed
@max-charlamb
max-charlamb deleted the dev/max-charlamb/parallel-test-pipelines branch November 17, 2026 18:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants