CLI Gantt Chart Generator

A lightweight, terminal-based tool that instantly converts text-based task lists into visual Gantt charts using Python and Matplotlib.

Features

  • Instant Visualization: Paste a list of tasks and generate a chart immediately.
  • Smart Sorting: Automatically arranges tasks chronologically (earliest start date at the top).
  • Duration Labels: Automatically calculates days and displays them next to the bars (e.g., 10d).
  • Validation: Robust error handling that tells you exactly which line is formatted incorrectly.
  • Micro-Task Support: Tasks starting and ending on the same day are rendered as 1-day blocks (instead of invisible lines).

Prerequisites

You need Python installed. This script relies on the matplotlib library.

To install the required library, run:

pip install matplotlib

How to Run

Save the code as gantt_chart.py.

Run the script in your terminal:

python gantt_chart.py

Usage

When the script runs, it will ask for input. You can paste a single task or a long list of tasks separated by semicolons.

The Input Format Task Name, Start Date, End Date; Next Task, Start Date, End Date

Dates: Must be YYYY-MM-DD.

Separator: Use a semicolon ; between distinct tasks.

Execution: Paste the text and hit ENTER once.

Example Input Copy and paste this block into the terminal:

Project Kickoff, 2026-05-01, 2026-05-01; UI Design, 2026-05-02, 2026-05-12; Backend Coding, 2026-05-10, 2026-05-25

Error Handling

The script includes strict validation. If you paste incorrect data, it will skip the bad entry and tell you why:

❌ ERROR: ... missing commas: You didn't provide 3 fields (Name, Start, End).

❌ ERROR: ... is not YYYY-MM-DD: You used the wrong date format (e.g., 05-01-2026).

❌ ERROR: ... ends before it starts: You set the End Date earlier than the Start Date.

Logic details

Sorting: The script uses reverse=True sorting so that when Matplotlib plots from the bottom (0,0) up, the earliest task appears visually at the top of the chart.

Duration Calculation: (End - Start) + 1. This ensures a task that starts/ends on the same day counts as 1 day of work.

License

MIT

About

A lightweight, terminal-based tool that instantly converts text-based task lists into visual Gantt charts using Python and Matplotlib.

Resources

Stars

4 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages