Skip to content

chore: add beads issue tracking setup#8

Merged
ichoosetoaccept merged 1 commit intomainfrom
12-24-chore_add_beads_issue_tracking_setup
Dec 24, 2025
Merged

chore: add beads issue tracking setup#8
ichoosetoaccept merged 1 commit intomainfrom
12-24-chore_add_beads_issue_tracking_setup

Conversation

@ichoosetoaccept
Copy link
Copy Markdown
Member

Initialize beads for local issue tracking:

  • .beads/ directory with config and database
  • .perles/ for kanban board configuration
  • AGENTS.md with workflow instructions
  • .gitattributes for merge handling

Copy link
Copy Markdown
Member Author

ichoosetoaccept commented Dec 24, 2025

Copy link
Copy Markdown
Member Author

ichoosetoaccept commented Dec 24, 2025

Merge activity

  • Dec 24, 3:43 PM UTC: A user started a stack merge that includes this pull request via Graphite.
  • Dec 24, 3:45 PM UTC: Graphite rebased this pull request as part of a merge.
  • Dec 24, 3:46 PM UTC: @ichoosetoaccept merged this pull request with Graphite.

@ichoosetoaccept ichoosetoaccept changed the base branch from 12-24-test_add_mcp_server_integration_tests_using_inmemorytransport to graphite-base/8 December 24, 2025 15:44
@ichoosetoaccept ichoosetoaccept changed the base branch from graphite-base/8 to main December 24, 2025 15:44
Initialize beads for local issue tracking:
- .beads/ directory with config and database
- .perles/ for kanban board configuration
- AGENTS.md with workflow instructions
- .gitattributes for merge handling
@ichoosetoaccept ichoosetoaccept force-pushed the 12-24-chore_add_beads_issue_tracking_setup branch from b9c290a to 3564f86 Compare December 24, 2025 15:45
@ichoosetoaccept ichoosetoaccept merged commit 1cebde7 into main Dec 24, 2025
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant