Skip to content

docs: add PoC-scale economic scenario to ADR 004 - #43

Merged
thiras merged 3 commits into
mainfrom
docs/poc-economics-adr004
Mar 29, 2026
Merged

thiras merged 3 commits into
mainfrom
docs/poc-economics-adr004

Conversation

@thiras

@thiras thiras commented Mar 29, 2026

Copy link
Copy Markdown
Contributor

Summary

  • Add "Revenue Model (PoC Reality)" section with realistic PoC traffic assumptions (~150 GB/month vs 10,000 GB/month production)
  • Add "Bootstrap Fund Gap (PoC)" section quantifying subsidy needs ($4K–$20K depending on network size/duration)
  • Clarify that the existing revenue model represents a production target, not PoC expectations

Closes #19

Test plan

  • Verify math: 150 GB × 1024 MB/GB × $0.00001/MB ≈ $1.50/month
  • Verify subsidy calculations: 20 nodes × 6 months × $34 = $4,080
  • Review ADR cross-references (ADR 003, 009, architecture.md) still make sense with renamed heading

🤖 Generated with Claude Code

The existing revenue model assumed production-level traffic (7,000 GB/month).
Add a realistic PoC scenario (~150 GB/month, −$33.50/month loss) and quantify
the bootstrap fund gap to make the subsidy requirement concrete.

Co-Authored-By: Claude Opus 4.6 (1M context) <[email protected]>
Copilot AI review requested due to automatic review settings March 29, 2026 19:56

@gemini-code-assist gemini-code-assist Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Code Review

This pull request updates the tokenomics ADR to distinguish between PoC and production revenue models. It adds detailed comparisons of delivery volumes, costs, and profitability for both stages, and introduces a section on the bootstrap fund requirements for PoC nodes. Feedback includes a suggestion to link to the unit economics section for better navigation and a correction to ensure mathematical consistency in the subsidy calculations.

Comment thread adr/004-tokenomics.md Resolved
Comment thread adr/004-tokenomics.md Resolved

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

Updates ADR 004’s node unit economics to explicitly distinguish production-target assumptions from realistic PoC-scale expectations, and quantifies the expected PoC subsidy gap (Issue #19).

Changes:

  • Reframes the existing “Revenue Model” as a production target rather than PoC expectations.
  • Adds a PoC-scale revenue scenario with lower traffic assumptions and resulting loss without subsidy.
  • Adds a PoC bootstrap subsidy estimate table and clarifies bootstrap fund adequacy at PoC scale.

💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.

Comment thread adr/004-tokenomics.md Resolved
Comment thread adr/004-tokenomics.md Resolved
Comment thread adr/004-tokenomics.md Resolved
thiras and others added 2 commits March 29, 2026 23:01
- Fix 233 → ~333 GB/day calculation
- Add clickable section anchor for Node Unit Economics cross-reference
- Add paid pull cost row to PoC table for consistency with production model
- Correct production gross profit to ~$35 (properly deducting pull cost)

Co-Authored-By: Claude Opus 4.6 (1M context) <[email protected]>
$100 revenue - $50 infra - $15 pull cost = $35, not $50.
Aligns the production target table with the PoC comparison table.

Co-Authored-By: Claude Opus 4.6 (1M context) <[email protected]>
@thiras
thiras merged commit d4a648c into main Mar 29, 2026
@thiras
thiras deleted the docs/poc-economics-adr004 branch March 29, 2026 20:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

ADR 004: Node economics assume unrealistic traffic for PoC

2 participants