Why

Tier 2 of the ADR book-readiness program. Builds on #344 (Tier 1 — preamble + reading order) by smoothing the prose so ADRs flow as chapters of a coherent spec rather than as 26 self-contained documents.

Should land after #344. Tier 1 establishes the reading order; Tier 2 makes that reading order actually flow.

Scope

1. Smooth narrative connectives between adjacent ADRs

ADR Context sections currently restate a lot of project-wide background ("the deCDN is a decentralized CDN where..."). When read sequentially, this repetition is friction. Rewrite Context openers to pick up from the previous chapter in the reading-order flow established by #344.

Example transformation:

  • Before (ADR 003 Context): "Clients pay nodes per MB. The protocol uses USDC for payments... [400 words of background]"
  • After: "ADR 005 defines the wire-level paid delivery protocol; this ADR specifies the on-chain payment infrastructure those byte-level payments settle against."

Rule of thumb: assume the reader has read everything earlier in the chapter ordering. Only restate what a chapter genuinely re-frames.

2. Lift cross-cutting concepts to canonical homes

Several concepts are restated in 3+ ADRs because each ADR was written self-contained. Pick one canonical home per concept and have other ADRs cross-ref:

Concept Canonical home Currently restated in
Epoch mechanics (1-week, ve-snapshot, gauge claim window) ADR 026 §2 027, 029, 020
FeeRouter contract surface (6 buckets, sum-to-100, settlement-time call) ADR 026 §2 + ADR 016 003, 018, 020, 023
Reentrancy + checks-effects-interactions pattern ADR 016 §Reentrancy 003, 026, 030
Challenge bond mechanics (transfer, forfeit, 50/50 split) ADR 014 §Bond Handling 002, 005, 011 (cross-ref now established in #343)
Slashing schedule (5/15/50 escalation, lifetime counter, 50/30/20 distribution) ADR 026 §8 011, 014, 010 (cross-ref now established in #343)

Audit during execution; this list is illustrative.

3. Standardize ADR section structure

Audit and unify the section conventions. Today some ADRs have ## Decision, some go straight to numbered sections, some have ## Consequences while others have separate ## Positive / ## Negative / ## Risks. Pick one shape and apply across the set.

Suggested canonical structure:

# ADR NNN: Title

## Context
## Decision (with numbered subsections)
## Consequences
  ### Positive
  ### Negative
  ### Risks
## Alternatives Considered  ← migrated out in Tier 3 (#346)

Acceptance

  • Reading the ADRs in the Tier 1 reading order, no Context section restates more than 2 sentences of project-wide background.
  • Each cross-cutting concept in the inventory has a single canonical home; other ADRs link to it.
  • All ADRs follow the same top-level section structure.
  • No content is lost — restated material is replaced with cross-refs, not deleted outright.

Out of scope

Risk

This is the highest-content-touch tier. Each ADR's Context will be edited; mis-applied edits could introduce factual drift. Recommend doing one chapter at a time and checking each chapter for cross-ref integrity before moving to the next.

Estimate

1-2 days, depending on how aggressive the rewrites are.

Metadata

Metadata

Assignees

Labels

kind:docs

Type

No type

Fields

Priority

None yet

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions