Skip to content

PaymentChannel: cut forced-inclusion detection; raise dispute-window floor to 48h #1196

Closed

Description

@alpergundogdu

Disposition: CUT machinery + harden floor (ADR 003; post-evaluation).

Forced-inclusion detection is un-implementable on Arbitrum One for the threat it targets: a user's signed delayed-inbox tx is indistinguishable from a sequencer tx (address aliasing applies only to unsigned L1-contract messages), so _arrivedViaForcedInclusion() can never correctly return true and the extension branch is permanently dead. At the 48h default it also adds nothing.

Action:

  • Remove _arrivedViaForcedInclusion() (contracts/src/PaymentChannel.sol:951), the extension branch (:508), FORCED_INCLUSION_GUARANTEE (:90), the extended field + reset (:477), and the test harness.
  • Raise the dispute-window governance floor from 12h to 48h (floor = default, per the monotonic-tightening posture); keep the 72h ceiling and 48h default.
  • Edit adr/003-payments.md §L2 sequencer censorship and adr/appendix-l2-deployment.md to state censorship resistance comes solely from keeping the baseline window above the L2 force-inclusion delay; drop the ArbSys-detection claim.

Filed from the ADR→implementation gap analysis. ADR edits must be made in place with no historical/tombstone text (no "planned but cut" sentences) per repo ADR convention.

Activity

  1. added
    kind:security
    design:adr
    prio:medium
    area:contracts
    on Jul 15, 2026
  2. added a commit that references this issue on Jul 15, 2026
    2b42f8d
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area:contractsdesign:adrkind:securityprio:medium

Type

No type

Fields

Priority

None yet

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions