ci(e2e): say what the 215-minute e2e budget actually covers
The comment on every lane claimed the budget fits two tenant
Kubernetes suites failing at their node-join deadline. A green full
suite on the container lane already spends most of it, and a suite that
runs into the deadline costs about 25 minutes more than one that
passes, so the claim does not hold. State the real bound so a cancelled
run is read as a red suite, not as a budget to raise.
Assisted-by: LLM
Signed-off-by: Aleksei Sviridkin <[email protected]>