Skip to content

Release 8.3.2 - The eMudhra Patch #9769

Closed

Description

@taylorsilva

We ship a bunch of container images, so because of https://emudhra.we-have-a-problem.com/ we should update all our container images and push a patch release.

Steps for a new patch release:

  • Ensure each resource type is pinned to whatever version was last shipped within the MAJOR.MINOR series. This is to avoid accidentally shipping breaking changes in resource types with patch releases.

    • If a patch release is being shipped in order to bump a resource type (e.g. for a CVE or bug fix), pin it to the appropriate version instead.
  • Once the final commit has made it through the pipeline, the create-draft-release job can be triggered. This job will create a draft release within the concourse GitHub release page where you can make any final adjustments or arrangements to the generated release notes. PLEASE NOTE that any manual changes made on the draft release WILL BE OVERWRITTEN if you retrigger the create-draft-release job. Please be sure to only make manual edits AFTER you are sure this is the final run of the job.

    • If you would like to edit the content, you can directly edit the PRs that it was generated from. The title is used for each PR and also the body within the Release Note header in the PR. After you have made your edits within the PR, you can rerun the create-draft-release job in order to regenerate a new release note.

    • If you would like to change the arrangement of the PRs within the release note, you can make the edits directly on the release note of the draft release.

  • Once everything is ready, the shipit job can be triggered. The publish-binaries job will convert your draft release into a final release including the body of your draft release (which will persist any changes you made to the draft release body). Subsequently, the promote concourse job will run automatically. The publish-docs job runs automatically, as long as the version is actually the latest version available.

  • The helm-chart pipeline is used to bump & then publish the chart.

Activity

  1. changed the title [-]Release 8.3.2[/-] [+]Release 8.3.2 - The eMudhra Patch[/+] on Oct 21, 2026
  2. taylorsilva commented on Oct 21, 2026

    @taylorsilva
    MemberAuthor
  3. pinned this issue on Oct 21, 2026
  4. taylorsilva commented on Oct 22, 2026

    @taylorsilva
    MemberAuthor

    Outside of the resource type images, we also ship a few Go binaries (Concourse, containerd, runc).
    We've already built all of these using go1.27.3 in our CI pipelines. The image we use for building Go binaries is here: https://ci.concourse-ci.org/teams/main/pipelines/concourse/jobs/build-golang-builder-image/builds/363 or docker.io/concourse/golang-builder@sha256:1c866bb8c4708c10ae510930dc0efdcf971ec523cde25562ffe96514fed00e47 which uses go1.27.3

  5. marcus-crane commented on Oct 22, 2026

    @marcus-crane
    Contributor

    @taylorsilva Thanks for your hard work! 😀

  6. taylorsilva commented on Oct 22, 2026

    @taylorsilva
    MemberAuthor

    Just to show how "wild" everything is right now:

    • I released new versions of all the resource types today. They were all scanned by trivy before releasing and passed their scans
    • All of those resource types were then funnelled into RC-28 and scanned again by trivy, now 2-6hrs later since I released those versions, and the git-resource fails its scan!
    Image

    Now I'm releasing another patch version of the git-resource and restarting the release pipeline. Need to wait for an rc-29 now.

    The ground is shifting so much right now 😩

  7. taylorsilva commented on Oct 23, 2026

    @taylorsilva
    MemberAuthor

    We did it! Binary, image, bosh, and helm packaging are all updated. Update to v8.3.2 ASAP!

  8. Kump3r commented on Oct 23, 2026

    @Kump3r
    Contributor

    We appreciate the fast reaction and ad-hoc work, thanks @taylorsilva!

  9. unpinned this issue on Nov 4, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions