@cjcjameson

Hi there,

When I fly up a new pipeline on my local Mac OS machine within a BOSHlite, I often only want to trigger a specific pathway at first for local development. Therefore, at a "fan out" juncture, where one resource feeds 3 jobs (for example), I'll pause two of them to make sure the other one runs first.

I expect that the immediately downstream job from the not-paused job will trigger next and start working.

What happens after one job finishes is that the two paused jobs are still pending, radiating grey, and the downstream job is also marked pending.

The workaround is to cancel the two pending runs of paused jobs. What happens then is that the expected job runs, and then new pending runs for paused jobs are again enqueued. If the desired pipeline has more steps, it's once again blocked.

I feel like this is a regression from a previous fix. I feel like the update in release v0.53 to default things to paused was a stopgap measure for this issue previously. But that wasn't so great either, and it introduced other annoyances.

Let me/us know if there's more info you need!

Thanks,
C.J.

Activity

  1. vito commented on Jan 26, 2016

    @vito
    Contributor

    Are you using serial groups?

    The change in v0.53 was not a stopgap measure, and sounds unrelated to this.

  2. concourse-bot commented on Jan 26, 2016

    @concourse-bot

    Hi there!

    We use Pivotal Tracker to provide visibility into what our team is working on. A story for this issue has been automatically created.

    The current status is as follows:

    • #112432473 Paused jobs trigger, are marked pending, block the worker queue

    This comment, as well as the labels on the issue, will be automatically updated as the status in Tracker changes.

  3. cjcjameson commented on Jan 27, 2016

    @cjcjameson
    ContributorAuthor

    We are using serial groups. All the 4 jobs in my example are in the same serial group: "images".

    We are pretty aggressive and strict about serial groups for a few reasons:

    • We don't expect these builds to change too often in practice/production. They only cycle frequently when we're re-tooling the pipeline.
    • The builds are rather resource intensive. We instituted serialization to try to keep our deployment from falling over (or crashing our BOSHlite, can't quite recall).

    I'm blocked trying to get my Vagrantfile fixed right now, but once I've got a local concourse running again, I'll experiment with "what happens when we remove the serial groups?". I hypothesize, as it sounds you do as well, that without serial groups, the paused & pending jobs would not block the worker queue for other jobs' builds.

    Mm, very good. Disregard my reference to v0.53

  4. cjcjameson commented on Jan 27, 2016

    @cjcjameson
    ContributorAuthor

    Confirmed that when we remove the serial groups and fly set-pipeline, the 4th job is immediately kicked off. The paused jobs' builds are still glowing grey, pending.

    So we're not experiencing the bug harshly anymore. But still seems weird that paused jobs get enqueued.

  5. vito commented on Jul 13, 2016

    @vito
    Contributor

    Closing in favor of #520 which is a bit "fresher"

  6. added a commit that references this issue on Aug 17, 2016
    3ea66aa
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions