You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
If BOSH rolls out a change to a canary VM and something breaks, BOSH should fail the deploy and stop. If an ATC VM rolls out and isn't healthy (e.g., doesn't serve requests, can't connect to the database), the deploy should fail. If a worker VM rolls out and isn't healthy (e.g., can't start containers), the deploy should fail. Otherwise, it's too easy for a bad configuration change to roll out to all VMs and hose the whole cluster. We use concourse to do just about everything, so it's a real pain when we break it. We've had good results with the pattern of running a health check until it passes (or times out) in a BOSH post-start, like UAA does: https://github.com/cloudfoundry/uaa-release/blob/develop/jobs/uaa/templates/bin/post-start.
One simple addition would be a /health endpoint for ATC that we can ping in a post-start. I'm not sure what the worker health check should look like--maybe it just needs to be able to run a busybox container.
Activity
bump etree tsa handlers mux clockwork goxmldsig genproto grpc
taylorsilva commentedon Jan 6, 2025
Issue Bankruptcy
This issue is being closed as part of 2025's Issue Bankruptcy declaration. See here for details
If you think this issue still has merit then feel free to open a new issue and reference this one.