You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit 948817a
Browse filesBrowse the repository at this point in the historyBrowse files
fix(ios): bound the launch-confirmation re-press by the open request's deadline
The re-press after a watchdog-abandoned accept used a fresh 25 s budget from the
first press, which ignored the time open had already spent, and reserved only
the press watchdog. The daemon now hands the open its request deadline: the
enforced daemon deadline when the request has one, otherwise the transport
admission time plus what the client envelope leaves the daemon. Another press
starts only while that deadline covers the press and its verification read,
each with a readiness preflight, and every runner alert command and the URL
owner lookup are capped at the time left. A request without a deadline is not
re-pressed.
Refs #3861
Co-Authored-By: Claude Opus 5.5 <[email protected]>
0 commit comments