Description
Describe the bug
I believe backups are sometimes being run twice when using scheduled backups.
This sometimes results in Vorta reporting that a backup did not complete successfully (one of the two duplicate scheduled backups fails).
This sometimes results in Vorta creating two backups for the same scheduled backup - these can be seen in the 'Archives' tab .
In addition to the above issues, the value for 'Next Backup' in the 'Schedule' tab does not appear to be updated - clearly this is fairly minor.
To Reproduce
Steps to reproduce the behavior:
- Use the 'Backup every...' facility in the Schedule tab
Environment (please complete the following information):
- OS: Arch Linux
- Vorta version: Vorta 0.7.8
- Installed from: Arch AUR - vorta-git. (
pacman -Q vorta-gitoutputsvorta-git r565.fba6a2f-1) - Borg: 1.1.17
Additional context
I previously used the vorta AUR package. However, I was affected by #1083 and switched to using vorta-git. As such I am running Vorta built from the latest commit - currently fba6a2f.