Skip to content

[9.0.2] Include rctx.os.{name,arch} in the pre declared inputs hash (https://github.com/bazelbuild/bazel/pull/29148)#29194

Merged
iancha1992 merged 1 commit intobazelbuild:release-9.0.2from
bazel-io:cp29148-9.0.2-081907
Apr 7, 2026

Conversation

@bazel-io
Copy link
Copy Markdown
Member

@bazel-io bazel-io commented Apr 2, 2026

Description

Motivation

Fixes bazel-contrib/rules_go#4581

Build API Changes

No

Checklist

  • I have added tests for the new use cases (if any).
  • I have updated the documentation (if applicable).

Release Notes

RELNOTES: The local and remote repo contents cache now include the host OS and CPU architecture in the cache key.

Closes #29148.

PiperOrigin-RevId: 893352625
Change-Id: I02c0ded7ffe2b5aa9bc2ef489dc5240b5716ebdf

Commit 2ec24b4

…uild#29148)

### Description

### Motivation
Fixes bazel-contrib/rules_go#4581

### Build API Changes

No

### Checklist

- [ ] I have added tests for the new use cases (if any).
- [ ] I have updated the documentation (if applicable).

### Release Notes

RELNOTES: The local and remote repo contents cache now include the host OS and CPU architecture in the cache key.

Closes bazelbuild#29148.

PiperOrigin-RevId: 893352625
Change-Id: I02c0ded7ffe2b5aa9bc2ef489dc5240b5716ebdf
@bazel-io bazel-io requested a review from a team as a code owner April 2, 2026 08:19
@bazel-io bazel-io added team-ExternalDeps External dependency handling, remote repositiories, WORKSPACE file. awaiting-review PR is awaiting review from an assigned reviewer labels Apr 2, 2026
@bazel-io bazel-io requested a review from meteorcloudy April 2, 2026 08:19
@iancha1992 iancha1992 enabled auto-merge April 2, 2026 19:02
@iancha1992 iancha1992 requested a review from Wyverald April 2, 2026 19:02
@fmeum
Copy link
Copy Markdown
Collaborator

fmeum commented Apr 4, 2026

@iancha1992 I think this is worth cutting another RC for. Perhaps we also have other changes that could go into one?

@iancha1992 iancha1992 added this pull request to the merge queue Apr 7, 2026
Merged via the queue into bazelbuild:release-9.0.2 with commit f2fd8ea Apr 7, 2026
46 checks passed
@github-actions github-actions Bot removed the awaiting-review PR is awaiting review from an assigned reviewer label Apr 7, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

team-ExternalDeps External dependency handling, remote repositiories, WORKSPACE file.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants