Skip to content

chore: Upgrade cosign to latest 2.x version#848

Merged
thesayyn merged 1 commit into
bazel-contrib:mainfrom
honnix:honnix/upgrade-cosign
Oct 15, 2025
Merged

chore: Upgrade cosign to latest 2.x version#848
thesayyn merged 1 commit into
bazel-contrib:mainfrom
honnix:honnix/upgrade-cosign

Conversation

@honnix

@honnix honnix commented Oct 13, 2025

Copy link
Copy Markdown
Contributor

Upgrade cosign to latest 2.x version.

I read through the release notes and there is no breaking change for the CLI itself.

@aspect-workflows

aspect-workflows Bot commented Oct 13, 2025

Copy link
Copy Markdown

Test

8 test targets passed

Targets
//examples/assertion/attest_external:test [k8-fastbuild]     2s
//examples/assertion/sign_external:test [k8-fastbuild]       1s
//examples/attest:test [k8-fastbuild]                        2s
//examples/attest:test_attest_no_repo_fails [k8-fastbuild]   32ms
//examples/attest:test_attest_no_repo_passes [k8-fastbuild]  3s
//examples/sign:test [k8-fastbuild]                          2s
//examples/sign:test_sign_no_repo_fails [k8-fastbuild]       121ms
//examples/sign:test_sign_no_repo_passes [k8-fastbuild]      1s

Total test execution time was 12s. 41 tests (83.7%) were fully cached saving 9s.

@honnix
honnix marked this pull request as ready for review October 13, 2025 14:06
@thesayyn
thesayyn merged commit de0f1b2 into bazel-contrib:main Oct 15, 2025
12 checks passed
@honnix
honnix deleted the honnix/upgrade-cosign branch October 15, 2025 21:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants