ApexGantt

A JavaScript library to create Gantt diagrams built on SVG

Installation

To add the ApexGantt to your project and its dependencies, install the package from npm.

npm install apexgantt

Usage

import ApexGantt from 'apexgantt';

To create a basic gantt with minimal configuration, write as follows:

<div id="gantt-container"></div>
const ganttOptions = {
  series: [
    {
      id: 'a',
      startTime: '10-11-2024',
      endTime: '11-01-2024',
      name: 'task 1',
      progress: 65,
    },
    {
      id: '5',
      startTime: '10-11-2024',
      endTime: '10-26-2024',
      name: 'subtask 1.1',
      parentId: 'a',
      progress: 65,
    },
  ],
};
const gantt = new ApexGantt(document.getElementById('gantt-container'), ganttOptions);
gantt.render();

Setting the License

To use ApexGantt with a commercial license, set your license key before creating any chart instances:

import ApexGantt from 'apexgantt';

// set license key before creating any charts
ApexGantt.setLicense('your-license-key');

const gantt = new ApexGantt(document.getElementById('gantt-container'), ganttOptions);
gantt.render();

ApexGantt Options

The layout can be configured by passing a second argument to ApexGantt with the properties listed below.

Option Type Default Description
series TaskInput[] required Task data array. See data format below.
theme 'light' | 'dark' 'light' Built-in color theme preset.
width number | string '100%' Width of the chart container.
height number | string 500 Height of the chart container.
pixelsPerDay number auto-fit Continuous zoom level. The header tier (year/quarter/month/week/day/hour/minute) is auto-picked from this value. Reference points: 0.5 ≈ year, 1.6 ≈ quarter, 4.9 ≈ month, 25.7 ≈ week, 80 = day. Bounds clamp to roughly [0.25, 1280]. When omitted, the chart auto-fits the data span into the visible timeline area on first render; supply an explicit value (or zoom via the toolbar) to take control.
snapUnit 'day' | 'hour' | 'minute' 'day' Granularity at which task drag, resize, and inline edits snap. Independent of timeline header tier.
snapValue number 1 Multiplier applied to snapUnit, e.g. snapUnit: 'minute', snapValue: 15 → 15-min steps.
inputDateFormat string 'MM-DD-YYYY' dayjs-compatible format used to parse startTime / endTime values. Include time tokens (e.g. 'YYYY-MM-DD HH:mm') to enable sub-day editing — inline-edit inputs switch to datetime-local automatically.
canvasStyle string '' Arbitrary CSS injected onto the root container element.
backgroundColor string '#FFFFFF' Background color of the chart container.
headerBackground string '#f3f3f3' Background color of the header row.
rowHeight number 28 Height of each task row in pixels.
rowBackgroundColors string[] ['#FFFFFF'] Alternating row background colors; the pattern cycles automatically.
tasksContainerWidth number 425 Initial pixel width of the task-list panel.
columnConfig ColumnListItem[] undefined Custom column definitions for the task-list panel. Controls which columns are shown, their order, titles, and widths. See Column Configuration.
barBackgroundColor string '#318CE7' (light) / '#818CF8' (dark) Default background fill color for task bars.
barBorderRadius string '5px' CSS border-radius applied to task bars.
barMargin number 4 Top and bottom margin inside each row for the task bar.
barTextColor string '#FFFFFF' Text color rendered inside task bars.
barLabel BarLabelOptions { position: 'right', field: 'name' } Per-task bar label. Defaults to position: 'right' so labels stay visible regardless of bar width. Set position: 'inside' to render centered inside the bar, 'left' to render before it, or 'auto' to pick between 'inside' and 'right' based on bar width; supply render: (task) => string | HTMLElement to compose the name with chips, icons, or owner info. When position: 'left', the timeline auto-reserves 120px of leading space so labels don't disappear under the task-list panel — tune via barLabel.leadingPadding. Outside labels are not currently rendered for milestones.
summaryBarColor string '#B9CECE' (light) / '#8FBCBC' (dark) Fill color for summary (group) bars.
milestoneColor string '#7C3AED' (light) / '#A78BFA' (dark) Fill color for milestone diamonds.
arrowColor string '#94A3B8' (light) / '#94A3B8' (dark) Color of dependency arrows between tasks. Subtle slate-gray by default so links don't compete with bars.
dependencies DependencyOptions {} Polish + editing for dependency arrows: cornerRadius (rounded joints), hitWidth (invisible thicker stroke for hover/click targeting), tooltipTemplate: (ctx) => string (HTML on hover — requires non-zero hitWidth), classBuilder: (ctx) => string | string[] (per-arrow CSS class for cross-team / blocked / etc), editable: boolean (hover darkens the arrow, click selects it and reveals a "✕" affordance — click the ✕ or press Delete to remove via the undoable command path; on bar hover two anchor circles appear at the bar's start/finish edges, and dragging from one to another bar draws a dashed preview that commits the new dependency on release — the (source-anchor, target-anchor) pair determines the type: right→left FS, left→left SS, right→right FF, left→right SF), allowSummaryDescendantLinks: boolean (allow drawing edges between a summary task and its descendants; off by default since such edges confuse downstream date math). When editable: true, hitWidth is auto-bumped to at least 12 if unset. The ctx carries fromTask, toTask, type, and lag.
calendar CalendarOptions undefined Working-calendar config. When set, weekends + holidays drive duration math, summary aggregation, and timeline stripes — durations stop counting calendar days and start counting working days. Fields: workingWeekdays: number[] (0 = Sunday … 6 = Saturday; default [1, 2, 3, 4, 5]), holidays: Array<string | Date | { date, label? }> (non-working dates regardless of weekday; mixed forms allowed), showNonWorkingStripes: boolean (render hatched bands over weekend/holiday columns; default true), holidayTooltip: (ctx) => string (optional HTML rendered when the user hovers a holiday stripe — ctx.date is the Date, ctx.label is whichever string was supplied in the matching entry), dragSnapMode: 'next' | 'previous' | 'allow' (what happens when a drag/resize commits onto a non-working day — 'next' (default) snaps forward, 'previous' snaps backward, 'allow' permits non-working start/end. Drag preserves the source task's working-day duration across the snap; resize snaps the moving endpoint only. No effect when snapUnit !== 'day' or the input format carries time tokens). Absent calendar = today's behavior (every day is a working day, no stripes, no snap).
borderColor string '#DFE0E1' Color of cell and row divider lines.
cellBorderColor string '#D0D7DE' Border color for all cells in the task table and timeline grid.
cellBorderWidth string '1px' CSS border-width for all cell lines.
columnLines boolean true Whether to draw vertical lines between timeline columns. Set to false for a cleaner look that keeps only the horizontal row dividers.
enableProjectBoundary boolean false When true, two vertical lines mark the project's earliest start and latest end across all rows. Auto-recomputes when tasks are added, removed, or rescheduled.
projectBoundaryColor string '#7C3AED' Stroke colour for the project-boundary lines. Falls back to annotationBorderColor when omitted.
enableRollups boolean false When true, summary (parent) rows display thin rollup markers below the summary bar at each leaf descendant's date range. Useful for keeping children visible at a glance even when the parent is collapsed.
enableResize boolean true Allow the task-list panel to be resized by dragging the divider.
enableExport boolean true Show the SVG export button in the toolbar.
enableInlineEdit boolean false Allow editing task fields directly in the task-list cells (double-click to edit name, startTime, endTime, duration, progress). Auto-enabled when enableTaskEdit is true; set explicitly to false to opt out. See Inline Editing.
enableTaskDrag boolean true Allow tasks to be reordered by dragging rows in the task list.
enableTaskEdit boolean false Show the inline task-edit form when a task row is clicked.
enableTaskResize boolean true Allow task bars to be resized by dragging their handles.
enableProgressDrag boolean true Allow editing task progress by dragging the small handle that appears at the bottom of the bar on hover. Snaps to whole percent on commit and emits a taskProgressChanged event.
enableTaskEditingShortcuts boolean false Enable keyboard shortcuts on the task-list panel: Delete / Backspace removes the focused task (cascade: children), Tab indents under the previous sibling, Shift+Tab outdents to the grandparent. Off by default; opt in once you've decided the shortcuts fit your app. All operations are recorded in the undo history and respect beforeTaskDelete / beforeTaskMove hooks.
enableTaskCRUDToolbar boolean false Show built-in + Add task and trash-icon Delete buttons in the toolbar. Delete is auto-disabled when nothing is selected and deletes every selected task (cascade: children) on click; Add inserts a root-level "New task" using placeholder dates derived from the current project span. Combine with enableSelection: true for the delete button to be useful.
enableContextMenu boolean false Show a built-in right-click menu on task bars and task-list rows with entries for Edit, Add child / sibling task, Indent, Outdent, and Delete (cascade). Entries are gated by capability — Edit only when enableTaskEdit is on; Indent/Outdent only when the move is legal. Off by default so consumers can ship their own menu without competing.
enableAddTaskRow boolean false Render a single-line + Add task row at the bottom of the task list that inserts a new root-level placeholder task on click (or Enter / Space). Disabled while row virtualisation is active (dataset ≥ 50 rows).
history { enabled?: boolean; maxSize?: number } { enabled: true, maxSize: 100 } Configures the undo/redo history. Every mutating call (drag, resize, inline / dialog edit, add, delete, move, dependency change) is recorded unless enabled: false. Use gantt.undo() / gantt.redo() to traverse, gantt.canUndo() / gantt.canRedo() to gate UI affordances, and the historyChange event to react to changes. The toolbar shows Undo/Redo buttons when enableTaskCRUDToolbar is on and history is enabled; Ctrl/Cmd+Z and Ctrl+Y / Ctrl+Shift+Z trigger undo/redo from anywhere inside the chart (except text inputs).
enableTooltip boolean true Show a tooltip on task-bar hover.
enableSelection boolean false Enable row selection (click, Ctrl+Click, Shift+Click, keyboard).
beforeTaskAdd (ctx) => boolean | void undefined Veto hook called immediately before gantt.addTask() inserts a task. Return false to cancel the insertion. ctx is { input, parentId? }.
beforeTaskUpdate (ctx) => boolean | void undefined Veto hook called before every update path (drag, resize, progress drag, inline / dialog edit, gantt.updateTask()). Return false to reject. ctx is { task, updates }.
beforeTaskMove (ctx) => boolean | void undefined Veto hook called immediately before gantt.moveTask() re-parents a task. Return false to cancel. ctx is { task, oldParentId?, newParentId? }.
beforeTaskDelete (ctx) => boolean | void undefined Veto hook called immediately before gantt.deleteTask() removes a task. Return false to cancel. ctx is { task, descendantIds, cascade: 'forbid' | 'children' | 'orphan' }. descendantIds is empty for 'orphan' since children survive.
beforeDependencyChange (ctx) => boolean | void undefined Veto hook called immediately before gantt.addDependency() / gantt.removeDependency() mutate an edge. Return false to cancel. ctx is { change: 'add'|'remove', fromId, toId, type, lag }.
showCheckboxColumn boolean true Show a checkbox column for multi-select. Only applies when enableSelection is true.
enableCriticalPath boolean false Calculate and highlight the critical path through dependent tasks.
criticalBarColor string '#E53935' (light) / '#F87171' (dark) Fill color for task bars on the critical path.
criticalArrowColor string '#E53935' (light) / '#F87171' (dark) Stroke color for dependency arrows on the critical path.
enableCrosshair boolean false Show a vertical crosshair line that follows the cursor across the timeline, with a label showing the precise date/time at the pointer position.
crosshairColor string '#318CE7' (light) / '#818CF8' (dark) Color of the crosshair line and the label background.
crosshairLabelFormat (date, tier) => string auto Custom formatter for the crosshair label. Receives the date under the cursor and the active sub-tier ('minute' | 'hour' | 'halfday' | 'day' | 'week' | 'month' | 'quarter' | 'year'). When omitted, the label auto-adapts to the active tier — 'ddd MM/DD/YYYY' for day-and-coarser tiers, 'MM/DD HH:mm' for halfday/hour/minute tiers.
baseline Partial<BaselineOptions> undefined When enabled: true, renders a thin baseline bar below each task bar. Hovering the baseline shows a tooltip with its planned start/end dates. When rowHeight isn't explicitly set, the default rowHeight is bumped to make room for the baseline without squeezing the actual bar.
tooltipId string 'apexgantt-tooltip-container' HTML id for the tooltip container element.
tooltipTemplate (task, dateFormat) => string built-in Custom function returning an HTML string for the task tooltip.
tooltipBorderColor string '#BCBCBC' Border color of the tooltip.
tooltipBGColor string '#FFFFFF' Background color of the tooltip.
fontColor string '#000000' Color for all text in the chart.
fontFamily string '' CSS font-family for the chart.
fontSize string '14px' CSS font-size for the chart.
fontWeight string '400' CSS font-weight for the chart.
annotationBgColor string '#F9D1FC' Background color of annotation markers.
annotationBorderColor string '#E273EA' Border color of annotation markers.
annotationBorderDashArray number[] [] SVG stroke-dasharray for annotation borders, e.g. [6, 3].
annotationBorderWidth number 2 Border width of annotation markers in pixels.
annotationOrientation Orientation Orientation.Horizontal Whether annotation lines are drawn horizontally or vertically.
annotations Annotation[] [] Array of annotation objects to overlay on the timeline.
parsing ParsingConfig undefined Field-mapping config to parse non-standard task shapes. See Data Parsing below.
toolbarItems ToolbarItem[] [] Custom controls rendered in the toolbar alongside the built-in zoom and export buttons. Each item can be a ToolbarButton, ToolbarSelect, or ToolbarSeparator.
taskListAriaLabel string 'Task list' aria-label for the task-list table, used by screen readers.

Default tooltip template

tooltipTemplate(task, dateFormat) {
    const items = [
      `<div>
        <strong>Name:</strong>
        <span>${task.name}</span>
      </div>
      `,
    ];

    if (task.type === TaskType.Task) {
      items.push(`
        <div>
          <strong>Start:</strong>
          <span>${getTaskTextByColumn(task, ColumnKey.StartTime, dateFormat)}</span>
        </div>
        <div>
          <strong>End:</strong>
          <span>${getTaskTextByColumn(task, ColumnKey.EndTime, dateFormat)}</span>
        </div>
        <div>
          <strong>Duration:</strong>
          <span>${getTaskTextByColumn(task, ColumnKey.Duration, dateFormat)}</span>
        </div>
        <div>
          <strong>Progress:</strong>
          <span>${task.progress}%</span>
        </div>
      `);
    } else if (task.type === TaskType.Milestone) {
      items.push(`
        <div>
          <strong>Date:</strong>
          <span>${getTaskTextByColumn(task, ColumnKey.StartTime, dateFormat)}</span>
        </div>
      `);
    }

    if (task.dependency) {
      items.push(`
        <div>
          <strong>Dependency:</strong>
          <span>${task.dependency}</span>
        </div>
      `);
    }

    return `
      <div style='display:flex;flex-direction:column;align-items:left;gap:5px;padding:5px 10px;'>
        ${items.join('')}
      </div>
    `;
  },

Expected data format to set as Options.series

Each tasks should be in below format

[
  {
    id: 'a', // unique id of the task
    startTime: '10-11-2024', // start time of the task
    endTime: '11-01-2024', // end time of the task
    name: 'task 1', // task name
    parentId: 'a', // parent task id
    progress: 65, // progress in percentage
  },
];

Per-task fields

Field Type Default Description
id string required Unique task identifier. Must be stable across renders.
name string required Display name shown in the task list and inside the bar.
startTime string required Task start date, parsed with inputDateFormat. Not required when showSummaryBar is true.
endTime string startTime Task end date. When omitted the task renders as a milestone. Not required when showSummaryBar is true.
progress number 0 Completion percentage (0–100).
type 'task' | 'milestone' 'task' Visual type of the task.
parentId string undefined ID of the parent task; creates a hierarchical (indented) relationship.
dependency string | TaskDependency undefined Declares a dependency on another task. A plain string is treated as a Finish-to-Start dependency. TaskDependency.lagUnit: 'working' | 'calendar' controls whether lag is interpreted as working days (the default when a calendar is configured) or raw calendar days.
barBackgroundColor string undefined Overrides the chart-level barBackgroundColor for this task only.
rowBackgroundColor string undefined Overrides the row background color for this task only.
collapsed boolean false Whether this task's children are initially collapsed.
showSummaryBar boolean true Renders this task as a summary (group) bar when it has children. Its date range is computed automatically from its descendants — startTime/endTime are ignored (a warning is logged if provided). The bar is read-only: drag, resize, and progress are disabled. Set to false to opt out and render the parent as a normal task bar.
baseline BaselineInput undefined Planned (baseline) dates rendered as a thin bar beneath the actual bar when baseline.enabled is true.

Expected annotation format to set as Options.annotations

Each tasks should be in below format

[
  {
    x1: '10-25-2024', // start date
    x2: 'END_DATE', // optional. If present, draw a rect from x1 to x2. If null, only draw line on x1,
    label: {
      text: 'Annotation rect', // label for the annotation
      fontColor: '#333333', // optional
      fontFamily: 'Arial', // optional
      fontSize: '12px', // optional
      fontWeight: 'bold', // optional
    },
  },
];

Column Configuration

Customize which columns appear in the task-list panel, their order, titles, and widths. When columnConfig is provided, it is authoritative — only the columns you list are rendered, in the order you specify. Omitted columns are hidden. Each entry is merged with defaults, so you only need to specify overrides.

Available column keys: Name, StartTime, EndTime, Duration, Progress, ProgressRing, Wbs.

Customize column widths

import {ColumnKey} from 'apexgantt';

const gantt = new ApexGantt(element, {
  series: tasks,
  columnConfig: [
    {
      key: ColumnKey.Name,
      title: 'Task Name',
      minWidth: '100px',
      flexGrow: 3,
    },
    {
      key: ColumnKey.StartTime,
      title: 'Start',
      minWidth: '100px',
      flexGrow: 1.5,
    },
    {
      key: ColumnKey.Duration,
      title: 'Duration',
      minWidth: '80px',
      flexGrow: 1,
    },
    {
      key: ColumnKey.Progress,
      title: 'Progress',
      minWidth: '80px',
      flexGrow: 1,
    },
  ],
});

Hide columns

Show only the columns you need by omitting the rest:

const gantt = new ApexGantt(element, {
  series: tasks,
  columnConfig: [
    {key: ColumnKey.Name, title: 'Task Name'},
    {key: ColumnKey.Progress, title: 'Progress'},
  ],
});

You can also use visible: false to keep a column in the config but hide it (useful for toggling at runtime via update()):

columnConfig: [
  {key: ColumnKey.Name, title: 'Task Name'},
  {key: ColumnKey.StartTime, title: 'Start'},
  {key: ColumnKey.Duration, title: 'Duration', visible: false}, // hidden
  {key: ColumnKey.Progress, title: 'Progress'},
],

Reorder columns

Change the array order to reorder the rendered columns:

columnConfig: [
  {key: ColumnKey.Progress, title: 'Progress'},
  {key: ColumnKey.Name, title: 'Task Name'},
  {key: ColumnKey.StartTime, title: 'Start'},
],

Include the End Date column

The EndTime column is available but not shown by default. Add it to your config:

columnConfig: [
  {key: ColumnKey.Name, title: 'Task Name'},
  {key: ColumnKey.StartTime, title: 'Start'},
  {key: ColumnKey.EndTime, title: 'End', minWidth: '70px', flexGrow: 1.5},
  {key: ColumnKey.Duration, title: 'Duration'},
  {key: ColumnKey.Progress, title: 'Progress'},
],

Show progress as a ring instead of text

Swap the default text Progress column for the built-in SVG ring variant — same data (task.progress), no setup needed:

columnConfig: [
  {key: ColumnKey.Name, title: 'Task Name'},
  {key: ColumnKey.StartTime, title: 'Start'},
  {key: ColumnKey.Duration, title: 'Duration'},
  {key: ColumnKey.ProgressRing, title: 'Progress', minWidth: '60px', flexGrow: 0.6},
],

ColumnKey.ProgressRing renders with sensible defaults (28px ring, blue arc). For full customisation (size, colours, accessor, per-task colour function) use the renderers.progressRing() factory with a custom column key — see Built-in renderer presets.

Include the WBS column

The Wbs column shows an auto-numbered Work Breakdown Structure code derived from each task's position in the parent/child tree (1, 1.1, 1.1.2, 2, …). Codes recompute automatically when tasks are added, removed, or moved. Opt in by listing it explicitly:

columnConfig: [
  {key: ColumnKey.Wbs, title: 'WBS', minWidth: '60px', flexGrow: 0.6},
  {key: ColumnKey.Name, title: 'Task Name'},
  {key: ColumnKey.StartTime, title: 'Start'},
  {key: ColumnKey.Duration, title: 'Duration'},
  {key: ColumnKey.Progress, title: 'Progress'},
],

The code is also available on each Task as task.wbs if you need to read it from event handlers, custom column renderers, or your own UI.

ColumnListItem properties

Property Type Default Description
key ColumnKey | string Built-in column identifier or any custom string id when render is supplied (required).
title string from defaults Header text displayed for the column.
minWidth string '30px' Minimum CSS width (used in minmax()).
flexGrow number 1 Flex proportion (used as fr units in CSS Grid).
visible boolean true Set to false to hide the column.
render ColumnRenderer Custom cell renderer. Required for custom columns; ignored for built-in keys.
accessor (task) => unknown Extracts the cell's underlying value (used by SVG export and future sort/filter features).

Custom column renderers

You can add columns that aren't part of the built-in set by giving them a string key and a render function. Two renderer presets ship with the library — renderers.avatars for assignee/resource columns and renderers.progressRing for completion-percentage columns. Both are tree-shakeable; only the ones you import get bundled.

import {ApexGantt, ColumnKey, renderers} from '@apexcharts/apexgantt';

const gantt = new ApexGantt(element, {
  series: tasks, // each task may include `assignees: Assignee[]`
  columnConfig: [
    {key: ColumnKey.Name, title: 'Task'},
    {
      key: 'assignees',
      title: 'Assigned',
      render: renderers.avatars({
        accessor: (task) => task.assignees,
        max: 4,
        size: 24,
      }),
    },
    {
      key: 'progressRing',
      title: '%',
      render: renderers.progressRing({size: 28, strokeWidth: 3}),
    },
  ],
});

Built-in renderer presets

Preset Source Options
renderers.avatars An assignee-stack with +N overflow and initials fallback. accessor, max, size, overlap, borderColor, fallbackColor
renderers.progressRing An SVG ring with optional centered numeric label. accessor, size, strokeWidth, progressColor, trackColor, showLabel, labelColor

Assignee type

The avatar preset reads from Assignee[]. It is a public type you can import:

import type {Assignee} from '@apexcharts/apexgantt';

interface Assignee {
  name: string; // required
  avatarUrl?: string; // when omitted, initials are rendered
  initials?: string; // override the auto-derived initials
  color?: string; // background color for the initials fallback
}

Writing your own renderer

A renderer is (ctx, el) => string | void | (() => void). Return one of three things depending on how you build the cell content:

Return Meaning Best for
string The library treats it as HTML and writes it to the cell via innerHTML. Always escape user-supplied text with the exported escapeHtml helper. Vanilla JS, the built-in presets
void You have already mounted content into el yourself. The library will not modify the cell's contents. Frameworks that own their own lifecycle
() => void Same as void, plus a cleanup function the library will invoke before the cell is discarded (row removal, full re-render, or destroy()). React createRoot, Angular ComponentRef, Vue createApp().mount()
import {escapeHtml, type ColumnRenderer} from '@apexcharts/apexgantt';

const statusPill: ColumnRenderer = (ctx) => {
  const status = ctx.task.status ?? 'unknown';
  return `<span class="pill pill-${escapeHtml(status)}">${escapeHtml(status)}</span>`;
};

The ctx argument provides:

Field Type Description
task Task The task being rendered.
options GanttOptions Resolved chart options — useful for theme-aware coloring.
rowIndex number Zero-based index in the visible task list.
isSummary boolean True when the row is a summary (group) bar.
isMilestone boolean True when the task is a milestone.

Using with React, Angular, or Vue

Use the cleanup return so the framework can unmount and free resources when a row is evicted (during virtualization scroll) or when the chart is destroyed. The library guarantees the cleanup function runs synchronously before the cell is reused or removed.

// React
import {createRoot} from 'react-dom/client';

const render: ColumnRenderer = (ctx, el) => {
  const root = createRoot(el);
  root.render(<AvatarStack assignees={ctx.task.assignees} />);
  return () => root.unmount();
};
// Angular — assuming you have a ViewContainerRef + a component to mount
const render: ColumnRenderer = (ctx, el) => {
  const ref = vcr.createComponent(AssigneesComponent);
  ref.setInput('task', ctx.task);
  el.appendChild(ref.location.nativeElement);
  return () => ref.destroy();
};
// Vue 3
import {createApp, h} from 'vue';
import AssigneesCell from './AssigneesCell.vue';

const render: ColumnRenderer = (ctx, el) => {
  const app = createApp({render: () => h(AssigneesCell, {task: ctx.task})});
  app.mount(el);
  return () => app.unmount();
};

Lifecycle contract

The library invokes the cleanup function in all three of these cases:

  1. The chart is destroyed (gantt.destroy()).
  2. A full re-render replaces the cell (e.g. gantt.update(), or any gantt.render() call).
  3. The row is evicted because the user scrolled it out of the virtualization window.

You do not need to listen for DOM mutations yourself. If your renderer returns a function, the library will call it.

Sub-day scheduling

Set inputDateFormat to a format that includes time tokens (e.g. 'YYYY-MM-DD HH:mm') and choose a finer snapUnit to schedule tasks at the hour or minute level:

const gantt = new ApexGantt(element, {
  series: tasks,
  inputDateFormat: 'YYYY-MM-DD HH:mm',
  snapUnit: 'minute',
  snapValue: 15, // drags/resizes snap in 15-minute steps
  pixelsPerDay: 600, // zoom in enough that hour cells show in the header
});

Behavior changes when inputDateFormat includes time:

  • The end-time of a task is treated as the exclusive end timestamp (a task from 10:00 to 10:30 is 30 minutes wide). Day-only formats keep the existing inclusive-end behavior (a task from Jan 10 to Jan 15 spans 6 cells).
  • Inline-edit startTime / endTime cells switch to datetime-local inputs.
  • The Duration column reports in the configured snapUnit suffix: d / h / m.

Working calendars (weekends + holidays) are supported via the calendar option — duration math, drag/resize snapping, and timeline stripes all honour the configured working days. Per-day working hours (e.g. skipping after-hours within a working day) are not yet supported and are planned for a future release.

Inline Editing

Set enableInlineEdit: true to let users edit task fields directly in the task-list cells without opening a form.

const gantt = new ApexGantt(element, {
  series: tasks,
  enableInlineEdit: true,
});

Inline editing is also auto-enabled by enableTaskEdit: true (which opens a dialog when a task bar is clicked), so the two surfaces ship together by default. Pass enableInlineEdit: false explicitly to keep the dialog without inline cell editing:

new ApexGantt(element, {
  series: tasks,
  enableTaskEdit: true,
  enableInlineEdit: false, // dialog only, cells stay read-only
});

How it works

  • Activate: double-click any editable cell.
  • Commit: press Enter or click outside the input (blur).
  • Cancel: press Escape to revert without saving.

Editable columns

Column Editor Notes
name text input Empty values are rejected (cancelled silently).
startTime native <input type="date"> For tasks (not milestones), the duration is preserved — endTime shifts by the same delta.
endTime native <input type="date"> Rejected if before startTime.
duration number input (min 1) Edits update endTime = startTime + duration - 1 day. startTime stays fixed.
progress number input (0100) Values clamp to the 0–100 range.

When inputDateFormat includes time tokens (e.g. 'YYYY-MM-DD HH:mm'), the startTime / endTime editors switch from <input type="date"> to <input type="datetime-local"> automatically so hour/minute edits round-trip correctly.

Cells that are not editable

  • Summary rows (parents with showSummaryBar) — only name is editable; dates/duration/progress are derived from descendants.
  • Milestones — only name and startTime are editable (no end / duration / progress).
  • Empty filler rows at the bottom of the task-list panel.

Events

Inline edits emit the same events as the inline TaskForm and the public updateTask() method, so consumers can listen on a single event regardless of which surface produced the change:

  • taskUpdate — fires before the change is applied.
  • taskUpdateSuccess — fires after a successful update; detail.updatedTask contains the resolved task.
  • taskUpdateError — fires if the update throws.
container.addEventListener('taskUpdateSuccess', (e) => {
  const {taskId, updatedTask} = e.detail;
  // persist to backend
});

Data Parsing

Map your existing data structure to ApexGantt format without manual transformation.

const apiData = [
  {
    task_id: 'T1',
    task_name: 'Design Phase',
    start_date: '01-01-2024',
    end_date: '01-15-2024',
    completion: 75,
  },
];

const gantt = new ApexGantt(document.getElementById('gantt'), {
  series: apiData,
  parsing: {
    id: 'task_id',
    name: 'task_name',
    startTime: 'start_date',
    endTime: 'end_date',
    progress: 'completion',
  },
});

Nested Objects & Transforms

Use dot notation for nested properties and inline transforms for data conversion:

const nestedData = [
  {
    project: {
      task: {id: 'T1', title: 'Design'},
      dates: {start: '01-01-2024', end: '01-15-2024'},
      status: {completion: 0.75},
    },
  },
];

const gantt = new ApexGantt(document.getElementById('gantt'), {
  series: nestedData,
  parsing: {
    id: 'project.task.id',
    name: 'project.task.title',
    startTime: 'project.dates.start',
    endTime: 'project.dates.end',
    progress: {
      key: 'project.status.completion',
      transform: (value) => value * 100, // convert to percentage
    },
  },
});

Supported fields: id, name, startTime, endTime, progress, type, parentId, dependency, barBackgroundColor, rowBackgroundColor, collapsed, showSummaryBar

📘 Public API

1. update(options)

Updates the entire Gantt chart with new configuration and task data.

Parameters

Name Type Description
options Object Contains updated config and data. Must include a tasks array and other Gantt configuration options.

Example

ganttInstance.update({
  series: [
    {
      id: 'task-1',
      name: 'Design Phase',
      start: '2025-07-01',
      end: '2025-07-10',
      progress: 40,
    },
    // more tasks...
  ],
  pixelsPerDay: 25.7, // week density
});

2. updateTask(taskId, taskData)

Updates the specific task with provided task data.

Parameters

Name Type Description
taskId string ID of the task to be updated
taskData Object Data of the task to be updated

Example

ganttInstance.updateTask('task-1', {
  name: 'Design Phase',
  start: '2025-07-01',
  end: '2025-07-10',
  progress: 40,
});

3. addTask(input, options?)

Inserts a new task and re-renders the chart. The operation is recorded in the undo history. Emits a taskAdded event on success. If a beforeTaskAdd hook is configured and it returns false, the insertion is cancelled and the method returns null. Throws when input.id is missing or already exists.

Parameters

Name Type Description
input TaskInput Task data; id is required.
options { parentId?: string } Optional parent id to insert the task under. Omit for a root-level task.

Returns the inserted Task, or null when the beforeTaskAdd hook cancels.

Example

ganttInstance.addTask({
  id: 'task-9',
  name: 'Review',
  startTime: '2026-08-01',
  endTime: '2026-08-05',
});

ganttInstance.addTask(
  {id: 'subA', name: 'Subtask', startTime: '2026-08-01', endTime: '2026-08-03'},
  {parentId: 'task-9'}
);

4. deleteTask(taskId, options?)

Removes a task and re-renders. Recorded in the undo history. Emits a taskDeleted event on success. Dependency edges that reference the removed task(s) are auto-cleaned in the same transaction, so undo restores both tasks and edges atomically; one dependencyRemoved event fires per auto-removed edge before taskDeleted.

Cascade modes:

  • 'forbid' (default) — throws when the task has children. Safe default to prevent accidental subtree loss.
  • 'children' — deletes the task plus every descendant in a single undoable transaction.
  • 'orphan' — reparents the immediate children to the deleted task's parent (or root if the deleted task was a root), then removes just the task. A taskMoved event fires for each reparented child. Dependency edges between surviving (reparented) children are preserved; only edges that reference the deleted task itself are cleaned up.

If a beforeTaskDelete hook is configured and it returns false, the removal is cancelled and the method returns false. Throws when the task id is not found, or when cascade: 'forbid' and the task has children.

Parameters

Name Type Description
taskId string Id of the task to remove.
options { cascade?: 'forbid' | 'children' | 'orphan' } Cascade mode. Default 'forbid'.

Returns true if the task was removed, false if the hook cancelled.

Example

// leaf task — forbids by default but the task has no children so it's removed
ganttInstance.deleteTask('task-3');

// summary task — opt in to cascade
ganttInstance.deleteTask('task-1', {cascade: 'children'});

// remove a summary but keep its children, moving them to its parent
ganttInstance.deleteTask('task-1', {cascade: 'orphan'});

5. moveTask(taskId, options?)

Re-parents a task and re-renders. Recorded in the undo history. Emits a taskMoved event. If beforeTaskMove returns false, the move is cancelled and the method returns false.

Throws when taskId doesn't exist, when newParentId doesn't exist, when moving onto itself, or when the move would create a cycle.

Sibling reordering within the same parent is not modelled yet — that lands with Phase-4 cascade work.

Parameters

Name Type Description
taskId string Id of the task to move.
options { newParentId?: string | null } New parent id. Pass null (or omit) to move the task to the root.

Returns true if the move was applied (or was a no-op), false if the hook cancelled.

Example

ganttInstance.moveTask('subA', {newParentId: 'p2'});
ganttInstance.moveTask('subA', {newParentId: null}); // promote to root

6. addDependency(fromId, toId, options?)

Creates a dependency edge between two tasks and re-renders the arrow. Recorded in undo history. Emits dependencyAdded. Runs through beforeDependencyChange.

Throws when either task doesn't exist, or when the edge already exists.

Parameters

Name Type Description
fromId string Source task id (predecessor).
toId string Target task id (successor).
options { type?: 'FS' | 'FF' | 'SS' | 'SF'; lag?: number } Defaults: type: 'FS', lag: 0.

Returns true on success, false if the hook cancelled.

Example

ganttInstance.addDependency('t1', 't2'); // FS, lag 0
ganttInstance.addDependency('t1', 't2', {type: 'SS', lag: 2});

7. removeDependency(fromId, toId)

Removes a dependency edge and re-renders. Recorded in undo history. Emits dependencyRemoved with the captured type and lag. Runs through beforeDependencyChange.

Throws when no edge exists between the two tasks.

Example

ganttInstance.removeDependency('t1', 't2');

7a. canAddDependency(fromId, toId, options?)

Tells whether a new edge fromId → toId would be accepted right now, without committing it. Shared by the programmatic API and the interactive draw UI so both apply the same rules.

Returns { ok: true } when the edge would be accepted, or { ok: false, reason } where reason is one of:

reason meaning
self fromId === toId
task-missing either id is not in the data model
duplicate an edge fromId → toId already exists
cycle the new edge would close a cycle in the dependency graph
summary-descendant one endpoint is an ancestor of the other (gated by allowSummaryDescendantLinks)
hook-veto beforeDependencyChange returned false

Example

const verdict = ganttInstance.canAddDependency('t1', 't2');
if (verdict.ok) ganttInstance.addDependency('t1', 't2');
else console.warn(verdict.reason);

8. undo()

Rolls back the most recent recorded transaction through the same command bridge that forward operations use; data and DOM return to the pre-operation state. Emits historyChange with kind: 'undo'.

Returns true if a transaction was undone, false when the undo stack is empty or history.enabled is false.

Example

ganttInstance.updateTask('t1', {progress: 90});
ganttInstance.undo(); // restores the previous progress

9. redo()

Replays the most recently undone transaction. Pops from the redo stack and re-executes through the command bridge; emits historyChange with kind: 'redo'.

Any new mutating call between undo() and redo() discards the redo stack — once a fresh transaction is recorded, future redos are no longer reachable.

Returns true if a transaction was redone, false otherwise.

Example

ganttInstance.undo();
ganttInstance.redo(); // reapplies the rolled-back change

10. canUndo() / canRedo()

Returns whether an undoable / redoable transaction is currently on top of the stack. Use these to gate custom Undo/Redo UI affordances.

myUndoButton.disabled = !ganttInstance.canUndo();

11. clearHistory()

Drops every recorded transaction and emits historyChange with kind: 'clear'. Useful after loading a fresh dataset where rolling back to a previous tree state would be incoherent.

ganttInstance.update({series: freshTasks});
ganttInstance.clearHistory();

12. getHistorySize()

Returns the current undo/redo stack sizes as { undo: number, redo: number }. Handy for debugging or surfacing a "you have N undo steps left" hint.

13. zoomIn()

Zooms in the gantt based on current view mode. View mode direction for zoom in year -> quarter -> month -> week -> day

Example

ganttInstance.zoomOut();

14. zoomOut()

Zooms out the gantt based on current view mode. View mode direction for zoom in day -> week -> month -> quarter -> year

Example

ganttInstance.zoomOut();

Events

ApexGantt emits CustomEvents on the container element for various user interactions, allowing you to track and respond to changes in real-time.

Available Events

Event When Detail
taskUpdate Task is being updated { taskId, updates, updatedTask, timestamp }
taskUpdateSuccess Update completed successfully { taskId, updatedTask, timestamp }
taskValidationError Form validation failed { taskId, errors, timestamp }
taskUpdateError Update failed { taskId, error, timestamp }
taskAdded Task inserted via gantt.addTask() { taskId, task, parentId?, timestamp }
taskDeleted Task removed via gantt.deleteTask() { taskId, task, removedDescendantIds, timestamp }
taskMoved Task re-parented via gantt.moveTask() { taskId, oldParentId?, newParentId?, timestamp }
dependencyAdded Edge created via gantt.addDependency() { fromId, toId, type, lag, timestamp }
dependencyRemoved Edge removed via gantt.removeDependency() { fromId, toId, type, lag, timestamp }
taskDragged Task bar is dragged { taskId, oldStartTime, oldEndTime, newStartTime, newEndTime, daysMoved, affectedChildTasks, timestamp }
taskResized Task bar is resized { taskId, resizeHandle, oldStartTime, oldEndTime, newStartTime, newEndTime, durationChange, timestamp }
taskProgressChanged In-bar progress handle is dragged to a new value { taskId, oldProgress, newProgress, timestamp }
historyChange The undo/redo stack changed — kind is 'record', 'undo', 'redo', or 'clear' { kind, canUndo, canRedo, undoSize, redoSize, topUndoLabel?, topRedoLabel?, timestamp }

Events Usage

Vanilla JS

import ApexGantt, {GanttEvents} from 'apexgantt';

const container = document.getElementById('gantt');
const chart = new ApexGantt(container, {series: tasks});
chart.render();

// Hook into updates to save to your backend
container.addEventListener(GanttEvents.TASK_UPDATE_SUCCESS, async (e) => {
  const {updatedTask} = e.detail;
  /* use this updatedTask for any server operations */
});

// handle any errors
container.addEventListener(GanttEvents.TASK_UPDATE_ERROR, (e) => {
  console.error('Update failed:', e.detail.error);
});

React

import {useRef, useEffect} from 'react';
import ApexGantt, {GanttEvents} from 'apexgantt';

function GanttChart({tasks}) {
  const containerRef = useRef(null);

  useEffect(() => {
    const chart = new ApexGantt(containerRef.current, {series: tasks});
    chart.render();

    const handleSuccess = async (e) => {
      const {updatedTask} = e.detail;
      /* use this updatedTask for any server operations */
    };

    containerRef.current.addEventListener(GanttEvents.TASK_UPDATE_SUCCESS, handleSuccess);

    return () => {
      containerRef.current?.removeEventListener(GanttEvents.TASK_UPDATE_SUCCESS, handleSuccess);
      chart.destroy();
    };
  }, [tasks]);

  return <div ref={containerRef} />;
}