You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
@codelipenghui I added one item to the key_shared subscription - adding the support for a sticky-range reader. The requirement is coming from Flink connector. We need to read a sub-stream (a range) from a given message id. This should be pretty straightforward to add since a reader is an exclusive non-durable subscription. So we can just seek to the provided message id and filter the messages based on the key/value.
@yjshen can chime in for more requirements for Flink connector.
@david-streamlio the core functionalities for this PIP are already done. It has been used in quite bunch of productions. the left items are more or fewer enhancements.
@codelipenghui I think we should consider moving the items that are not done into a separate issue for tracking, close this issue and mark BP-38 as done.
Activity
sijie commentedon Apr 29, 2019
@codelipenghui I added an issue #4169 for the requirements of supporting sticky consumers in Key_Shared subscription.
sijie commentedon Nov 25, 2019
@codelipenghui I added one item to the key_shared subscription - adding the support for a sticky-range reader. The requirement is coming from Flink connector. We need to read a sub-stream (a range) from a given message id. This should be pretty straightforward to add since a reader is an exclusive non-durable subscription. So we can just seek to the provided message id and filter the messages based on the key/value.
@yjshen can chime in for more requirements for Flink connector.
david-streamlio commentedon Mar 18, 2020
Is there an ETA for this PIP?
sijie commentedon Mar 18, 2020
@david-streamlio the core functionalities for this PIP are already done. It has been used in quite bunch of productions. the left items are more or fewer enhancements.
@codelipenghui I think we should consider moving the items that are not done into a separate issue for tracking, close this issue and mark BP-38 as done.
codelipenghui commentedon Mar 19, 2020
@sijie I have added new issues for the items that are not done. So close this issue now.
sijie commentedon Mar 19, 2020
@codelipenghui thank you