Skip to content

perf(arrow): build the Arrow schema from the output projection - #3737

Open
ViktorBystrov72 wants to merge 1 commit into
apache:mainfrom
ViktorBystrov72:oss/iceberg-rust-3572-arrow-projection
Open

ViktorBystrov72 wants to merge 1 commit into
apache:mainfrom
ViktorBystrov72:oss/iceberg-rust-3572-arrow-projection

Conversation

@ViktorBystrov72

@ViktorBystrov72 ViktorBystrov72 commented Nov 20, 2026 •

Copy link
Copy Markdown

Which issue does this PR close?

Closes #3572

What changes are included in this PR?

Build the Arrow schema for the fields in the output projection. The transformation plan uses the requested field order. The existing recursive converter handles nested types and field metadata.

Are these changes tested?

rustfmt --check, git diff --check and the GitHub CI checks passed. Local review covered column reordering, nested Variant fields and identity partition constants. A local full build and benchmark remain to be run.

AI Disclosure

Codex (gpt-6.2-sol) assisted with the code. A separate Paradev review checked projection order and virtual columns. A benchmark would quantify the impact on schema construction.

@ViktorBystrov72 ViktorBystrov72 changed the title perf(arrow): строить схему по выходной проекции perf(arrow): build the Arrow schema from the output projection Nov 21, 2026
@ViktorBystrov72
ViktorBystrov72 force-pushed the oss/iceberg-rust-3572-arrow-projection branch from a1f5f4b to ba9ad7d Compare November 23, 2026 14:30
@ViktorBystrov72
ViktorBystrov72 marked this pull request as ready for review November 23, 2026 15:42
@ViktorBystrov72
ViktorBystrov72 force-pushed the oss/iceberg-rust-3572-arrow-projection branch from ba9ad7d to e3e4fe4 Compare November 24, 2026 10:07

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

perf(arrow): build RecordBatchTransformer's plan from the projected fields only

1 participant