Skip to content

[v3-3-test] Regenerate provider requirement tables in breeze ci upgrade (#73802) - #73829

Merged
potiuk merged 1 commit into
v3-3-testfrom
backport-23bcbe6-v3-3-test
Sep 28, 2026
Merged

potiuk merged 1 commit into
v3-3-testfrom
backport-23bcbe6-v3-3-test

Conversation

@github-actions

Copy link
Copy Markdown
Contributor

Raising dependency floors changes provider pyproject.toml files, but the
requirement tables rendered from them into README.rst and docs/index.rst
are only refreshed by prek hooks, and the upgrade commit is made without
prek git hooks installed. Every upgrade PR that raised a provider floor
therefore failed static checks until the tables were regenerated by hand.
(cherry picked from commit 23bcbe6)

Co-authored-by: Jarek Potiuk [email protected]
Generated-by: Claude Opus 5

…de (#73802)

Raising dependency floors changes provider pyproject.toml files, but the
requirement tables rendered from them into README.rst and docs/index.rst
are only refreshed by prek hooks, and the upgrade commit is made without
prek git hooks installed. Every upgrade PR that raised a provider floor
therefore failed static checks until the tables were regenerated by hand.
(cherry picked from commit 23bcbe6)

Co-authored-by: Jarek Potiuk <[email protected]>
Generated-by: Claude Opus 5
@potiuk
potiuk force-pushed the backport-23bcbe6-v3-3-test branch from 5edd7ee to b09eafd Compare September 28, 2026 10:32
@potiuk
potiuk merged commit f4b9886 into v3-3-test Sep 28, 2026
222 of 223 checks passed
@potiuk
potiuk deleted the backport-23bcbe6-v3-3-test branch September 28, 2026 15:09
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant