You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Start Date for DAG runs metrics not applied #66047
When navigating from the "Start" page via the metrics section to the DAG runs the DAG-state filter is applied correctly, but the start_date filter is not applied.
The URL params are for example: /dag_runs?state=success&start_date=2026-04-27T19%3A04%3A49.319Z
The endpoint takes start_date_gte as parameter, which is not passed in the current version.
What you think should happen instead?
After navigating to the DAG runs page the correct date filter should be set.
By changing the URL param manually the expected behaviour can be achieved:
Thanks for opening your first issue here! Be sure to follow the issue template! If you are willing to raise PR to address this issue please do so, no need to wait for approval.
Activity
boring-cyborg commentedon Apr 28, 2026
Thanks for opening your first issue here! Be sure to follow the issue template! If you are willing to raise PR to address this issue please do so, no need to wait for approval.
stefanherdy commentedon Apr 28, 2026
Dear community,
to solve the issue i created a PR here
henry3260 commentedon Apr 29, 2026
@stefanherdy Can you close this issue since #66045 is merged