You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Idempotency: downstream rollup behavior when an upstream partition is cleared and re-run #65923
When a downstream rollup has already fired for a window that included an upstream partition, and that upstream partition is later cleared and re-run, the framework needs a defined behavior. Example: the monthly rollup for 2026-03 already fired with 2026-03-15 included; user clears and re-runs 2026-03-15. Does the rollup reprocess, hold, or no-op?
Open question
Auto re-trigger the rollup, require explicit user action, or expose a per-timetable policy?
Activity