Skip to content

Task duration keeps increasing for skipped tasks due to DAG timeout #58536

Closed

Description

@karenbraganz

Discussed in #53868

Originally posted by Szjs-z July 29, 2025
Hi Airflow community,

I've encountered an issue where task duration keeps increasing for tasks that are skipped due to DAG timeout:

Problem Description:
When a DAG run times out due to dagrun_timeout, the unfinished tasks are marked as SKIPPED. However, in the Web UI, the task duration continues to increase even though the task state is SKIPPED :

Screenshot 2025-07-29 at 17 42 11

Root Cause Analysis:
From code inspection in airflow/jobs/scheduler_job.py, the _schedule_dag_run method handles DAG timeout by:

        if (
            dag_run.start_date
            and dag.dagrun_timeout
            and dag_run.start_date < timezone.utcnow() - dag.dagrun_timeout
        ):
            dag_run.set_state(DagRunState.FAILED)
            unfinished_task_instances = session.scalars(
                select(TI)
                .where(TI.dag_id == dag_run.dag_id)
                .where(TI.run_id == dag_run.run_id)
                .where(TI.state.in_(State.unfinished))
            )
            for task_instance in unfinished_task_instances:
                task_instance.state = TaskInstanceState.SKIPPED
                session.merge(task_instance)
            session.flush()
            self.log.info("Run %s of %s has timed-out", dag_run.run_id, dag_run.dag_id)
  1. Setting DAG run state to FAILED
  2. Marking unfinished tasks as SKIPPED
  3. But it doesn't set end_date for these task instances

I'm wondering if this is a known issue or if there's a recommended way to handle this.

Thanks,
Chris Zhao

Activity

  1. added
    kind:bug
    on Nov 20, 2025
  2. karenbraganz commented on Nov 20, 2025

    @karenbraganz
    CollaboratorAuthor

    I have also been able to reproduce this issue on Airflow 2.11. I agree with Chris' analysis on the root cause.

    • The set_state method should be called for the unfinished task instances as well instead of directly setting the state in the DBso that the end_date is set.
    • The task instance duration should also be set.
    • Additionally, callbacks should be run because the task instance could have an on_skipped_callback.
    • This code only skips the running task instances. Downstream task instances remain in the None state. Why aren't all task instances skipped?
  3. tirkarthi commented on Nov 22, 2025

    @tirkarthi
    Contributor

    See also #30264

  4. steveahnahn commented on Nov 22, 2025

    @steveahnahn
    Contributor

    Opened a PR to address this issue in #58588

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:corekind:bug

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions