DAG Runs from a single DAG can prevent scheduler from seeing other DAG's runs #49508

Description

@collinmcnulty

Apache Airflow version

2.10.5

If "Other Airflow 2 version" selected, which one?

No response

What happened?

Two DAGs each receive a large batch of DAG Runs. The number of runs for each DAG exceeds max_dagruns_per_loop_to_schedule. Each DAG run is very short, shorter than the heartrate of this Airflow deployment. Both DAGs have a max_active_runs that is far less than dagruns_per_loop.

So: max_active_runs < max_dagruns_per_loop_to_schedule < number of queued DAG runs.

Each scheduler loop, there are a very small number of DAG Run "slots" for the first DAG, so the check coalesce(running_drs.c.num_running, text("0")) < coalesce(Backfill.max_active_runs, DagModel.max_active_runs), does not apply. But then all the DAG runs that are considered are from the first DAG. So Second DAG effectively has to wait for nearly all of First DAG's runs to complete before any of its runs are moved from queued to running.

What you think should happen instead?

I think the "most correct" thing to do is to change the global yes/no for a DAG being included in the check on the basis of max_active_runs to some kind of limit on the number for that DAG that can be included. I can't see a good way to do this in SQL but others may have insight.

Alternatively, because this is predominantly a problem when a single DAG dominates the scheduler's attention, we could add an explicit check to see if the result of the DAG run query contains only the a single DAG, and if so re-run the query with that DAG excluded.

How to reproduce

  1. Create two DAGs with a single, simple task.
  2. Set max_active_runs=100
  3. Set max_dagruns_per_loop_to_schedule=2000
  4. Start 5000 Runs of the first DAG
  5. Start 5000 Runs of the second DAG
  6. Hard to reproduce: keep the heartrate of the scheduler low enough that Runs complete within one scheduler loop.

Operating System

Debian GNU/Linux 12 (bookworm)

Versions of Apache Airflow Providers

No response

Deployment

Astronomer

Deployment details

No response

Anything else?

No response

Are you willing to submit PR?

  • Yes I am willing to submit a PR!

Code of Conduct

Activity

  1. added
    kind:bug
    needs-triage
    on Apr 21, 2025
  2. collinmcnulty commented on Apr 21, 2025

    @collinmcnulty
    ContributorAuthor

    The workaround we're using is to set max_dagruns_per_loop_to_schedule to a value greater than the largest number of Runs we'll get for any individual DAG.

  3. uranusjr commented on Apr 21, 2025

    @uranusjr
    Member

    The weird thing to me is we seems to have a mechanism for this

    query = (
    select(cls)
    .with_hint(cls, "USE INDEX (idx_dag_run_running_dags)", dialect_name="mysql")
    .where(cls.state == DagRunState.RUNNING)
    .join(DagModel, DagModel.dag_id == cls.dag_id)
    .join(BackfillDagRun, BackfillDagRun.dag_run_id == DagRun.id, isouter=True)
    .where(
    DagModel.is_paused == false(),
    DagModel.is_stale == false(),
    )
    .options(joinedload(cls.task_instances))
    .order_by(
    nulls_first(BackfillDagRun.sort_ordinal, session=session),
    nulls_first(cls.last_scheduling_decision, session=session),
    cls.run_after,
    )
    .limit(cls.DEFAULT_DAGRUNS_TO_EXAMINE)
    )

    This should prioritize runs we have not touched (nulls first), or touched the least recently. So even if a run is not seen in an iteration, runs before it (and thus touched) should be deprioritized until all other runs were also touched, and so on, so each run should get a chance at some point. Maybe the last_scheduling_decision timestamp is not updated correctly?

  4. uranusjr commented on Apr 22, 2025

    @uranusjr
    Member

    I tried to reduce this to a reasonable minimal scenario. This is against main since we did not notice any significant logic changes in the area.

    • Two dags 1 and 2 both have one single task. Both dags set max_active_runs=1. The task simply does sleep(5).
    • Set AIRFLOW__SCHEDULER__MAX_DAGRUNS_PER_LOOP_TO_SCHEDULE to 1.
    • Trigger 10 runs for 1, and then 10 for 2, both via API (I used a Python script with requests so the ordering is deterministic).

    After triggering, I can observe the scheduler actually alternates between the two dags. It picks up a run from the first dag, and then a run from the second, the first, the second, and so on. Interetingly, I did not see any logs on max_active_runs at all; the scheduler seems to just do it out of the box.

    So I think we’re missing something. Not sure what…

    DAG code
    from airflow.providers.standard.operators.python import PythonOperator
    from airflow.sdk import DAG
    
    def wait():
        import time
        time.sleep(5)
    
    with DAG("1", is_paused_upon_creation=False, max_active_runs=1):
        PythonOperator(task_id="t", python_callable=wait)
    
    with DAG("2", is_paused_upon_creation=False, max_active_runs=1):
        PythonOperator(task_id="t", python_callable=wait)
    Triggering script
    import datetime
    import sys
    
    import requests
    
    def main(*dag_ids):
        r = requests.post(
            "http://localhost:8080/auth/token",
            json={"username": "admin", "password": "admin"},
        )
        r.raise_for_status()
        token = r.json()["access_token"]
        for dag_id in dag_ids:
            for i in range(10):
                r = requests.post(
                    f"http://localhost:8080/api/v2/dags/{dag_id}/dagRuns",
                    json={
                        "dag_run_id": f"{dag_id}_{i}",
                        "logical_date": datetime.datetime.now(datetime.timezone.utc).isoformat(),
                    },
                    headers={"Authorization": f"Bearer {token}"},
                )
                print(r.json())
                r.raise_for_status()
    
    
    if __name__ == "__main__":
        _, *dag_ids = sys.argv
        main(*dag_ids)
    
    # Run like this: python script.py 1 2

    scheduler-output.txt

  5. eladkal commented on Apr 28, 2025

    @eladkal
    Contributor

    It seems that starvation can happen. Also reported in #45636

    Given 2 pools default_pool and special_pool with 2 DAGs:

    from datetime import datetime
    from airflow import DAG
    from airflow.decorators import task
    import time
    
    default_args = {
        'owner': 'airflow',
        'start_date': datetime(2023, 2, 1)
    }
    
    with DAG('scheduler1', schedule="@daily", catchup=True, default_args=default_args):
    
        @task()
        def sleep_it1():
            time.sleep(3600) # 1 hour
        sleep_it1()
    
    with DAG('scheduler2', schedule=None, catchup=False, default_args=default_args):
        @task(pool="special_pool")
        def sleep_it2():
            time.sleep(60) # 1 min
    
        sleep_it2()
    

    The scheduler1 dag creates many dagruns as it has catchup. Once those runs are created there is large "backlog" of tasks to complete, create a run in scheduler2. The task sleep_it2 will not be executed till all runs of sleep_it1 are finished. That is though in each loop of the scheduler it can not really schedule tasks of sleep_it1 but can schedule sleep_it2.
    I waited for more than 30 min and sleep_it2 did not get scheduled though it can be.

    Image

    This happens both in Airflow 2 and Airflow 3.

  6. collinmcnulty commented on Apr 28, 2025

    @collinmcnulty
    ContributorAuthor

    Aha, yes. That must be the missing ingredient that made it "hard" to reproduce. Still don't fully understand why each DAG Run in DAG 1 don't get marked with scheduling_decision and then DAG 2 is checked. It seems like the scheduler should be able to check all runs faster than 30 minutes.

  7. eladkal commented on Apr 28, 2025

    @eladkal
    Contributor

    Aha, yes. That must be the missing ingredient that made it "hard" to reproduce. Still don't fully understand why each DAG Run in DAG 1 don't get marked with scheduling_decision and then DAG 2 is checked. It seems like the scheduler should be able to check all runs faster than 30 minutes.

    Because when we read records from the database in the scheduler critical section we read as bulk. We don't have extra logic as we want this part to be as fast as possible. The logic comes after and you apply it on the bulk records you read (AIRFLOW__SCHEDULER__MAX_TIS_PER_QUERY)

  8. jscheffl commented on Apr 28, 2025

    @jscheffl
    Contributor

    We also had such issue (had a talk about this in https://airflowsummit.org/sessions/2024/how-we-tuned-our-airflow-to-make-1-2-million-dag-runs-per-day/) and I think my colleguage @AutomationDev85 supplied a fix to Airflow 2.6 or 2.7... we our problem in this area were gone.

    But one important remark: We ensured that the amount of parallel DAG runs is limited. We triggered new DAG runs in state "queued" and not "running", then the scheduler saves efforts in scheduling "not ready" runs. And was only adding "running" state at a point when sufficient DAGs have been worked-off. Can you try this?

  9. eladkal commented on Apr 29, 2025

    @eladkal
    Contributor

    Can you try this?

    Your approach definitely will work. In practice you bypassed the scheduler :)

    But I can't really use it. The environment is shared by many dag authors. I can't predict when bottle necks will occur and I don't want to act as a "police" over the cluster. My goal is to find a native solution, I think by now we know this is more common than just a unique edge case so we need to find a proper solutions without workarounds.

  10. IndiTheo commented on May 1, 2025

    @IndiTheo
    Contributor

    Looks convincing. According to OP, the second DAG's runs are stuck at queued and not getting scheduled, so it shouldn't be related to get_running_dag_runs_to_examine or pools or any issues with the critical section, because queued -> running transition for DAG runs happens much earlier than we get to any scheduling decisions for tasks (like creating TIs or scheduling them in CS). The whole logic for transitioning DAG runs to running is in SchedulerJobRunner._start_queued_dagruns and DagRun.get_queued_dag_runs_to_set_running, and the described behaviour is a consequence of the optimistic scheduling strategy used across Airflow not being able to handle a variety of edge cases.

    We first pull at most DEFAULT_DAGRUNS_TO_EXAMINE DAG runs whose DAGs are not yet maxed out:

    .where(
    # there are two levels of checks for num_running
    # the one done in this query verifies that the dag is not maxed out
    # it could return many more dag runs than runnable if there is even
    # capacity for 1. this could be improved.
    coalesce(running_drs.c.num_running, text("0"))
    < coalesce(Backfill.max_active_runs, DagModel.max_active_runs),
    # don't set paused dag runs as running
    not_(coalesce(Backfill.is_paused, False)),
    )

    And then go over each one of them increasing the currently scheduled DAGrun count and dropping once we can't stuff any more runs:


    elif dag.max_active_runs:
    if active_runs >= dag.max_active_runs:
    # todo: delete all candidate dag runs for this dag from list right now
    self.log.info(
    "dag cannot be started due to dag max_active_runs constraint; "
    "active_runs=%s max_active_runs=%s dag_id=%s run_id=%s",
    active_runs,
    dag_run.max_active_runs,
    dag_run.dag_id,
    dag_run.run_id,
    )
    continue

    It's indeed the same as #45636, but now with DAG runs instead of tasks. If the original issue can be efficiently solved with windowing, I guess this one can also benefit from it, like:

    1. Window partitioned by DAG
    2. For each DAG compute the number of runs
    3. Stuff new runs as far as there are free slots (per DAG)
    4. Put a limit on the result (which can be far less restrictive, as we delegate more work to SQL and the cost of a query won't go up as fast as throughput will).

    As windowing may introduce additional overhead which sometimes won't result in higher throughput, assuming there aren't so many DAG runs in the system, I'm looking for a compromise between the optimistic and the windowing (pessimistic) approaches. It's possible to have it configurable, though it will make the system harder and harder to tweak to everyone's needs, which is not desirable. I hope the windowing can be done in such a way that will be negligible for the query time, by the help of correct indexing, or completely changing some core concurrency parameters, like introducing DEFAULT_DAGS_TO_EXAMINE in favor of DEFAULT_DAGRUNS_TO_EXAMINE, where the new parameter limits the number of windows in the query. Some research is needed to find out.

  11. added this to the Airflow 3.0.2 milestone on May 6, 2025
  12. 26 remaining items

  13. added
    priority:medium
    on Jun 4, 2025
  14. amoghrajesh commented on Jun 4, 2025

    @amoghrajesh
    Contributor

    Reducing to medium priority as we cannot repro it easily.

  15. dstandish commented on Jun 5, 2025

    @dstandish
    Contributor

    Yeah Collin I think we need clarification on the repro scenario / under what conditions starvation occurs.

    Let me go through your post carefully

    Two DAGs each receive a large batch of DAG Runs. The number of runs for each DAG exceeds max_dagruns_per_loop_to_schedule.

    What state are the "received" in? I assume you mean triggered via API?

    Each DAG run is very short, shorter than the heartrate of this Airflow deployment.

    What is the signifigance of the runs being very short? What do you think that has to do with this?

    Both DAGs have a max_active_runs that is far less than dagruns_per_loop.

    Why? So that we can be confident that the scheduler should fetch some of these runs in the query?

    So: max_active_runs < max_dagruns_per_loop_to_schedule < number of queued DAG runs.
    Each scheduler loop, there are a very small number of DAG Run "slots" for the first DAG, so the check coalesce(running_drs.c.num_running, text("0")) < coalesce(Backfill.max_active_runs, DagModel.max_active_runs), does not apply. But then all the DAG runs that are considered are from the first DAG. So Second DAG effectively has to wait for nearly all of First DAG's runs to complete before any of its runs are moved from queued to running.

    Could it be that what you were observing had to do with last scheduling decision not getting updated because tasks were backed up somehow?

    I guess either way, this seems like a very rare edge case scenario and, if two people tried and failed it, not sure it's worth contiuning to try without new information.

  16. amoghrajesh commented on Jun 11, 2025

    @amoghrajesh
    Contributor

    Removing the milestone as we do not have a clear repro environment for this. We can revisit on the milestone once we can repro it easily/

  17. amoghrajesh commented on Mar 25, 2026

    @amoghrajesh
    Contributor

    Since this has not yet been picked up and we are approaching the 3.2 release, I am moving it to the 3.3 milestone.

  18. Nataneljpwd commented on Mar 25, 2026

    @Nataneljpwd
    Contributor

    Since this has not yet been picked up and we are approaching the 3.2 release, I am moving it to the 3.3 milestone.

    Hello, I have an open PR for this issue @amoghrajesh

    #64109

  19. added theissue type on Nov 5, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

_eol_affected_version:2.10affected_version:main_brancharea:corearea:schedulerkind:bugpriority:medium

Type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions