Currently, we are able to mark a DAG instance (a.k.a. run) as successful -- see the image below. This keeps it from being run by the scheduler and simultaneously conveys that this DAG instance or run was successful. We find that sometimes a run is not successful but rerunning it does not make sense. Sure, we could let the run eventually error out, but what if there are 30 days of runs that have this problem and we have retries set to 3? We don't want to wait for them to all error out, generating error notification emails and unnecessarily doing runs that will eventually fail.
I would like a "Do Not Run" or "Skip" button with the same options as "clear" -- do not run past/future/upstream/downstream.
This will allow me to skip broken downstream parts of DAGs for a date range.
This also provides an important option to ops, instead of relying on a developer who developed the DAG, with respect to managing the execution of DAGs.
Only_run_latest will be used for a job like a daily db snapshot job. Typically, this type of job needs to run once a day. If it doesn't run for 3 days because the DAG was paused, when the DAG is unpaused, the job should not run 3 times. It should only run for the latest time interval.
What I propose above is to mark entries manually as "skipped or do not run" so that the scheduler or backfill job does not attempt them. This could be because we know there is a data problem in the time range.
Activity
thibault-ketterer commentedon Sep 26, 2015
won't it be solved by "only_run_latest" #59 ?
r39132 commentedon Mar 16, 2016
@thibault-ketterer It won't. The goals are different.
Only_run_latestwill be used for a job like adaily db snapshotjob. Typically, this type of job needs to run once a day. If it doesn't run for 3 days because the DAG was paused, when the DAG is unpaused, the job should not run 3 times. It should only run for the latest time interval.What I propose above is to mark entries manually as "skipped or do not run" so that the scheduler or backfill job does not attempt them. This could be because we know there is a data problem in the time range.
r39132 commentedon Mar 16, 2016
This depends on #1155
pkexcellent commentedon Mar 26, 2016
Hi, @r39132
I want to ask if the feature of