Repository navigation
fix(company-database): count open company connections, not pool maxima - #993
Merged
Merged
Conversation
Rebased onto main after the TypeScript 7 stack (#985). Co-Authored-By: Claude Opus 5.5 <[email protected]>
allisonmahmood
force-pushed
the
t3/dynamic-company-backend-budget
branch
from
October 29, 2026 15:57
c4bbbfd to
9842a4f
Compare
1 of 2 tasks
allisonmahmood
added a commit
that referenced
this pull request
Oct 29, 2026
## What changed This adds release 23's What's new entry, written from `ed80fc7`. It covers everything merged since release 22's `through` (`a2d1331`), and sets the `patchy` release to `0.23.0` in `packages/patchy/package.json` and `CURRENT_RELEASE`. This is the speed and capacity release: patches that run server code open faster, and the fleet has room for more companies at once. | Change | PRs | | --- | --- | | Improved: Patches with server code open faster. Landing on Home or All patches readies the company's server and its three most-opened patches, a patch stays ready for ten minutes after use instead of one, loading a patch takes a third of the time, and each company server has twice the CPU | #991, #992, #997, #999, #984 | | Behind the scenes: Patchy can run patches for more companies at the same time (24 company boxes instead of 15, and 64 companies per host instead of 16) | #984, #993 | Two merged PRs get no line, because nobody using Patchy would notice them: #990 (a second AWS cost alert, at $600) is operations tooling, and #1049 (a test fix for flake #1012) is test churn. #1046 is release 22's own entry. ## Look at - **The entry**, at the top of `releases` in `packages/core/src/whatsNew.ts`. - **Rollback safety, from the live commit `eb414ed` (release 22) to `ed80fc7`:** - No PR in the range is labelled `one-way`, and none adds a migration. - #984 and #990 change infrastructure. A rollback redeploys release 22's stacks: 0.5 vCPU tasks, a fleet budget of 15 with two spares, and no `patchy-monthly-600` budget (the base stack deletes it; `patchy-monthly` is untouched). Exec task definitions are retained, so release 22's hosts can still manage this release's boxes until promotion. - #984's one rollback hazard: once this release holds 14 or more spare boxes, release 22 can't fit its two spares inside its budget of 15, and its promote step times out. The fix is the runbook in `docs/OPERATIONS.md` › Freeing budget for a promotion. - #999 leaves binding history rows with release cause `unused`, which release 22 reads as text. #999's new `speculative` bind field is refused by release 22's supervisors before they act, so prewarms on those boxes are skipped during a rolling deploy. - Neither `execution.process.load` (#992) nor `execution.prewarm.window` (#999) is set in production's `PATCHY_LIMITS_JSON`, so release 22 loads the configuration unchanged. **Rollback line:** If this release misbehaves, roll back to `eb414ed` (release 22). If that rollback's promote step times out short of two spares, follow `docs/OPERATIONS.md` › Freeing budget for a promotion, then re-run it. ## How it was verified - **Tests.** `whatsNew.test.ts`, `WhatsNewPages.test.ts` and `schemas.test.ts` pass (21 tests), and prettier passes on the changed files. - **The range.** Each PR was Sol-reviewed with every finding fixed. After the TypeScript 7 stack (#985), all seven were rebuilt on one integration branch, with each conflict and each TypeScript 7 fix kept in the PR it belongs to. `pnpm check` passed there, apart from local-only CLI and supervisor test failures caused by T3 probing this machine's ports. Each PR then landed with all 12 required checks green on its rebased head, and main's tree after #990 equals the integration tip. Re-runs: `clerk-live` once on #984 (a sign-in handshake flake). On #992, flake #1012 failed twice and was fixed by #1049 instead of re-running. - **Deploy state.** The live commit, pinned from `/healthz/deep`, is `eb414ed` (release 22). The Deploy run updated last succeeded, and none is unfinished. - **Quota.** #984 peaks at 29 vCPUs during a deploy (24 boxes, 4 rolling hosts, the promote task), inside the account's current 30. ## Release impact - [ ] **Breaking** — requires action from anyone already running this - [x] **Not breaking** — no action required Text and version numbers only. The `0.23.0` bump tells CLIs and patch repos installed before this deploy to upgrade, as every release does. - **What does a revert leave behind?** Nothing. - **Does the release before it still work with that?** Yes. Made by Claude Opus 5.5 (`claude-opus-5-5`) in Claude Code, running in T3 Code. Co-authored-by: Claude Opus 5.5 <[email protected]>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What changed
A host's company database budget (
PATCHY_COMPANY_DB_MAX_BACKENDS, 64 per host in production) was spent on reservations: each company pool held its full maximum of four from the moment it opened, so the 17th company active within a minute gotbusy, even though most pools held one connection or none. The budget now counts the company connections a host actually has open, working or idle. A company still grows to its own maximum when the budget allows. When the budget is full, a lease closes another company's longest-idle connection; only when every connection is working does it queue, within the existing bounds, and then return the samebusy.Look at
Each lease now holds exactly one connection. This is a behaviour change. A company pool is now a set of one-connection slots, one per lease (
withCompanyadmission or tier 2lease), and each slot holds one host backend while it is open. Before, statements inside one admission could spread over several of the company's connections at once. Now they share the lease's session. No caller runs SQL concurrently inside one admission today; tier 2 already held one connection per lease. A lease's authority read is its own admission, so it still gets its own connection.How many companies one host serves, budget 64. This drives the real
PgCompanyDatabaseslayer against the local dev instance's Postgres, with the same script and data on the base and the head. The numbers are counts, not timings, so one run each:2f9f7c1)busy hostBackendsbusy hostBackendsafter the 1 s waithostBackends)company.connections.pools)Tests red on base, green on head (
packages/company-database/src/CompanyDatabases.test.ts):busykeepsresource: "backend budget",scope: "host",limitId: company.connections.hostBackends,value,retryAfterSeconds: 1)The last two hold the evicted connection open from outside, so the evicting company stays paused mid-close. On the previous head both fail with
expected 'admitted' to equal 'queued': the owner opened a fifth connection over its maximum of four, or opened its next generation while the old connection was still live. Now a connection another company is closing stays counted against its own company's maximum, and blocks that company's generation change, until its close completes. That completion wakes the company's waiters.Every path that closes a slot goes through one close: the registry's 60-second expiry, an override drain or another company's eviction. The first caller marks the slot closing and takes it out of the eviction candidates before yielding. Every caller then waits on the same completion, which settles only once the connection has closed and its backend is free. Before this, an expiring pool's slot stayed an eviction candidate mid-close, and a second
Scope.closereturned at once, so another company could open a connection while the original was still live, over the host budget.A slot's scope is a child of its company's registry scope, so company or service teardown reaches a slot that is still opening. A slot forked from a company that has already closed closes at once: it returns its backend without opening a connection, and the admission is refused.
Slot lifecycle. Each cell says what happens to a slot in that state when the event occurs. A slot counts against the host budget from the moment its company decides to open it until its last finalizer runs. The comment above
closeSlotdescribes the same states.activeidle. After company or service teardown it stays in that closed company'sidle, so a request that already held the registry entry can take it, run SQL until the pool shuts, then fail or be interruptedactiveand frees its backend through its scope)retire: out of both idle lists at once; its company counts it inretiringuntilclosedclosed, not a secondScope.closeactiveat 0closeSloton each, the companydraininguntil all finishactiveto reach 0retiringto reach 0openSlotrefuses, no connection openedtryAcquireis uninterruptibleclosedis terminal: the backend is free,closedhas settled, and the slot is in no list.Follow-up, filed as #1014: the same company can briefly hold connections from two registry entries if it comes back while its expired entry is still closing.
RcMapdrops the key before closing the entry. This predates this PR, and the host budget holds either way.These existing tests are unchanged and still pass:
Follow-up, the next wall:
company.connections.poolsstill caps a host at 100 companies active within a minute (the second row above). Raising it is now cheap, since a retained pool with no open connection holds no backend. It's a separate concern, so it isn't in this PR.The counted number can be a little high, never low: a slot whose connection the driver closed after 60 idle seconds stays counted until the company's pool goes. Those slots are the longest idle, so they are the first to go when someone needs a backend.
How it was verified
pnpm verify(locked):browserfailed once on a tier 1 navigation test, then passed 81/81 on a rerun.lintfailed only on the throwaway measurement script, which was deleted.testfailed in thepackages/patchyCLI suites. Those fail the same way onorigin/mainon this machine (8 of 28 incliPublish.test.ts) and don't touch this code.testalso caught one real failure:packages/patches/src/Content.test.tsassumed a zero budget refuses at once. It now runs that check on the live clock, through the one-second wait. This is the only edit outsidepackages/company-database,packages/limitsand docs.packages/company-databasesuites: 45 passed.pnpm test:postgres-concurrency: 28 passed.busy, and no replacement opens. The round-2 scheduler probe for registry expiry racing eviction passes on this head; its same-company case fails on base too and is Company pool can exceed its maximum when its registry entry expires mid-close #1014. The round-3 service-shutdown scheduler probe passes all its interleavings on this head; the round-1 probes still refuse rather than overlap, at interleavings 24–29.docs/OPERATIONS.md, the company-database glossary and thecompany.connections.hostBackendsregistry text, withdocs/limits.md, the generated snapshot and thepatchy-serverskill table regenerated byrender-docs.Release impact
Tick exactly one.
In-process admission only. No schema, API, CLI or configuration format changes.
PATCHY_COMPANY_DB_MAX_BACKENDSkeeps its name and production value. It still bounds a host's company connections, so the Neon arithmetic in OPERATIONS is unchanged. One difference people may notice: a full host now queues for up to a second beforebusyinstead of refusing at once.Made by Claude Opus 5.5 via Claude Code; reviewed with GPT-6.1-Sol.