Skip to content

chore(proto): update buf.lock - #2379

Merged
lgecse merged 1 commit into
agntcy:mainfrom
vivekkrishna:chore/update-buf-lock
Oct 19, 2026
Merged

lgecse merged 1 commit into
agntcy:mainfrom
vivekkrishna:chore/update-buf-lock

Conversation

@vivekkrishna

Copy link
Copy Markdown
Contributor

Problem

googleapis isn't pinned in proto/buf.yaml, so task api:gen updates it to the latest BSR commit. A new commit was published after the last green main run, and since then the Verify job's "Check auto-generated code" step fails on every PR because it finds proto/buf.lock changed (e.g. #2378 and the go-libp2p-pubsub renovate PR).

Change

Update proto/buf.lock to the googleapis commit task api:gen resolves now (8ac61b9e502343289c8c42b17aa5b245).

Tests

task gen locally on this branch leaves no changes; no generated code differs.

task api:gen updates the googleapis dependency to the latest BSR commit, so the Verify job's auto-generated code check fails on every PR until buf.lock is updated. No generated code changes.

Signed-off-by: Vivek Krishna Choppa <[email protected]>
@vivekkrishna
vivekkrishna requested a review from a team as a code owner October 18, 2026 00:49
@github-actions github-actions Bot added the size/XS Denotes a PR that changes 0-49 lines label Oct 18, 2026
@codecov

codecov Bot commented Oct 18, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.

📢 Thoughts on this report? Let us know!

@lgecse
lgecse added this pull request to the merge queue Oct 19, 2026
Merged via the queue into agntcy:main with commit 34fa652 Oct 19, 2026
35 checks passed
@lgecse

lgecse commented Oct 19, 2026

Copy link
Copy Markdown
Member

Thanks @vivekkrishna, this PR fixed the failing job.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

size/XS Denotes a PR that changes 0-49 lines

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants