Repository navigation
fix(atunnel): close both relay ends - #1101
Closed
NekoPunch (orangeCatDeveloper) wants to merge 1 commit into
Closed
NekoPunch (orangeCatDeveloper) wants to merge 1 commit into
NekoPunch (orangeCatDeveloper) wants to merge 1 commit into
Conversation
Keith Mattix II (keithmattix)
approved these changes
Aug 21, 2026
Keith Mattix II (keithmattix)
left a comment
Collaborator
There was a problem hiding this comment.
Thanks for the fit
Aditya Shantanu (aditya-shantanu)
approved these changes
Aug 21, 2026
Aditya Shantanu (aditya-shantanu)
left a comment
Collaborator
There was a problem hiding this comment.
Verified the analysis and the fix.
- The race is exactly as described: the
context.AfterFunccloses ran on a detached goroutine, socancel()returning guaranteed nothing about stream state, and the unbufferedio.Pipewrite in the test raced the relay'sio.Copyagainst the close. Moving the closes into thectx.Done()branch of the relay loop makes "both sides closed before return" an actual postcondition, and the copy goroutines are still unblocked by those same closes (thedonechannel is buffered, so no leak). - Behavior on the normal completion path is unchanged — the relay still doesn't close either side when both copies finish, same as before with
defer stop(). - Ran
go test -race ./internal/atunnel/ -run TestRelayIngressCancellationClosesBothSides -count=5000locally (darwin/arm64): green. Also green with this branch merged into current main,-race -count=50over the relay/serve tests.
LGTM.
Aditya Shantanu (aditya-shantanu)
added a commit
to aditya-shantanu/substrate
that referenced
this pull request
Aug 24, 2026
Adopted from agent-substrate#1101 by @orangeCatDeveloper to unblock CI velocity. Fixes TestRelayIngressCancellationClosesBothSides (agent-substrate#1100): the close ran on a context.AfterFunc goroutine the test never waited for. Co-authored-by: NekoPunch <[email protected]>
Collaborator
NekoPunch (orangeCatDeveloper)
force-pushed
the
fix/relay-ingress-cancel-race
branch
from
August 25, 2026 01:57
c121405 to
8c22cb9
Compare
Cancellation closed streams asynchronously, so callers could observe relay completion before shutdown finished. Close both ends before returning to make completion deterministic.
NekoPunch (orangeCatDeveloper)
force-pushed
the
fix/relay-ingress-cancel-race
branch
from
August 25, 2026 03:32
8c22cb9 to
5360e3a
Compare
Yufan Su (yufan-su)
pushed a commit
that referenced
this pull request
Aug 25, 2026
…relay) (#1160) Fixes #675, fixes #1100, fixes #1146; addresses the CI flake in #1106. ## Why this PR Flaky tests are the single biggest drag on this repo's velocity right now: the three flakes fixed here account for the majority of red CI runs over the last 7 days (identity: 35 failures, parking: 32, relay: 9 — from the flake dashboard's cross-PR analysis of ~630 runs). Every red run costs a contributor a rebase-and-rerun cycle and costs reviewers signal. **This PR consolidates the three root-caused, in-flight fixes into one change to get CI green now and unblock the community — the goal is velocity, not authorship.** ## Credit where it's due All three fixes were root-caused and written by others; this PR adopts them onto latest main with their tests, unchanged in substance. Each commit carries a `Co-authored-by` trailer: | Commit | Original PR | Author | Root cause | |---|---|---|---| | e2e: give each probe fixture its own worker pool | #1147 | @orangeCatDeveloper | identity/egressmitm/imagevolume suites share one `workload: probe` pool label; cross-suite selection under concurrent suite processes dials workers that are not there | | atenet: never cancel an in-flight resume at the park budget | #991 | @omeryahud | the park budget doubled as the ResumeActor RPC deadline; a mid-restore cancel strands a RESUMING actor on a live worker | | atunnel: close the relay's both ends before returning | #1101 | @orangeCatDeveloper | the relay closed both ends from a `context.AfterFunc` goroutine the test never waits for | @Stevenjin8's #1107 correctly diagnosed the ateom readiness race in #1106; the control-plane readiness gap it targets remains real and open — this PR only removes the e2e-fixture contention that makes it fire constantly in CI. If maintainers prefer to land the original PRs individually instead, closing this one is completely fine — the point is that the fixes land somewhere, soon. ## Evidence the flakes are actually fixed **TestRelayIngressCancellationClosesBothSides (unit, `-race`):** - Unpatched main, `-count=3000`: **83 failures (2.8%)** — matches the 2.9% observed across 308 CI runs this week - This branch, `-count=10000`: **0 failures** **TestRequestParking (park-budget cancellation):** - The new `InFlightAttemptRunsToCompletion` and `LateRetryableErrorIsBudgetExhaustion` unit tests (from #991) encode the exact failure mode from #675 and pass under `go test -race -count=100 ./cmd/atenet/internal/router/ingress/` - The pre-fix behavior (budget cancelling the in-flight RPC) is deterministically reproduced by the old test it replaces **TestActorIdentity_AfterRestore_IsOwnID_NotGolden (probe pool isolation):** - Not reproducible outside CI (needs concurrent suite processes on a contended kind node), so verified statically: `${FIXTURE_SUFFIX}` is always `-<suite>` (internal/e2e/sandbox.go:189,201 — never empty), `probe-sized` already uses its own label, and no other manifest or selector references `workload: probe`. #1147's CI data shows all three failure signatures (missing `ateom.sock`, `runsc restore` killed, router 502/503) trace to cross-suite pool sharing; per-suite labels make the selector suite-local by construction - The definitive check is this PR's own CI plus the flake dashboard's 7-day window after merge — I will report the post-merge rates on #1106 Also run: `go build ./...`, `go vet` and the full `-race` suites of both touched packages — all green. ## What this PR deliberately does NOT fix `TestActorEgressHTTPS` (#1050, 4.6% this week, below the 5% flake threshold) has no root-caused fix yet — the 503 `upstream connect error` path needs investigation in a live cluster. #1103 (@orangeCatDeveloper) tightens the related `TestActorArbitraryPortAccess` assertion so those 503s stop passing silently; it should land after #1050's cause is fixed, or it converts hidden flakiness into visible red. ## Update (post-CI investigation) The first e2e runs failed on `TestRequestParking/ParkThenServed` (micro-VM lane). Investigation showed this is the **pre-existing dominant mode** of #675 — identical failures in main-era runs 32305728993 / 32397291519 / 32487958077 — not a regression: on micro-VM, `SuspendActor` returns before the snapshot upload completes, so the worker legitimately isn't free within the 5s park budget and the router's 503 is correct behavior. #991 fixes the *other* (mid-restore cancellation/stranding) mode. Commit d637690 makes the subtest retry while the worker is still freeing; a stranded worker still fails every attempt, so the regression stays pinned. **Additional validation:** - CI e2e-test now **passes both lanes** (run 32754691017) - Local kind cluster built from this branch: parking suite **10/10 consecutive passes**; identity + egressmitm + imagevolume run **concurrently** (the exact contention behind the identity flake) × 3 iterations — **9/9 suite passes** --------- Co-authored-by: Aditya Shantanu <[email protected]> Co-authored-by: NekoPunch <[email protected]> Co-authored-by: Omer Yahud <[email protected]>
NekoPunch (orangeCatDeveloper)
deleted the
fix/relay-ingress-cancel-race
branch
August 25, 2026 18:58
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Fixes #1100
TestRelayIngressCancellationClosesBothSidesfails on about 1% of-raceruns, on branches unrelated to the relay.Root cause
The test asserts a close that happens on a goroutine it never waits for.
relayIngressWithHalfCloseclosed both sides from acontext.AfterFunccallback, which runs on its own goroutine.cancel()returning therefore says nothing about whether the streams are closed — and the test asserted right after it.The client side is an unbuffered
io.Pipe, where aWritecannot complete on its own; it needs someone on the other end. Two goroutines can be that someone:AfterFunccallback closes the pipeWritefails → test passesio.Copy, still parked inReadWritereturns nil → test failsThe scheduler picks the winner, so the test is a coin flip.
-racewidens the window by two orders of magnitude — 1 failure per 10000 plain, 89 with-race— and CI runsgo test -race -v ./....The
actor.Readassertion just above races the same close, but carries a one-second deadline and so almost always wins. TheWritehas no such slack, which is why the failure is always line 123.Fix
Production. Close both sides in the
ctx.Done()branch the relay loop already selects on, rather than from a detached goroutine. This turnsinto
which is what a caller can build on, and it drops a goroutine plus its
stop()bookkeeping.Test. Wait for the relay to return, then assert. The
SetReadDeadlineerror check goes with it: once the relay has closed the pipe, setting a deadline on it fails by design, and the deadline was only ever a guard against hanging if the connection had been left open.Nothing changes about the bytes the relay moves — this is a shutdown-ordering fix, not a data-plane one.
Before / after
Linux/x86_64, 4 cores, matching CI. On darwin/arm64 the same runs give 202 failures before and 0 after.