Skip to content

docs(release): date the 3.3 changes that first shipped in beta.6, not rc.0 - #9186

Merged
bokelley merged 3 commits into
mainfrom
docs/3.3-triage-beta6-attribution
Nov 23, 2026
Merged

bokelley merged 3 commits into
mainfrom
docs/3.3-triage-beta6-attribution

Conversation

@bokelley

@bokelley bokelley commented Nov 23, 2026 •

Copy link
Copy Markdown
Contributor

Summary

The 3.3 release notes, the 3.2-to-3.3 migration guide and What's new in 3.3 dated several changes to rc.0. They first shipped in 3.3.0-beta.6. This PR corrects those dates, using the release tags as evidence. Docs only.

  1. The closed-schema triage (Minor releases sometimes break older buyers, and our versioning rules disagree about whether that's allowed #8501: fix(schema): withdraw 3.3 additions from get_products and sync_creatives assignments (#8501) #8758, fix(schema): keep 3.3 additions off the deprecated create_media_buy and update_media_buy (#8501) #8767, fix(schema): available_installment_statuses moves to the canonical reporting capabilities (#8501) #8957) and the schema opening that led to it (fix(schemas): open the 3.3 schemas that were meant to be open #8866). Corrected on all three pages.
  2. Eight other beta.6 changes labeled rc.0 on the release notes and the migration guide: docs(creative): sellers accept creatives that conform to the declared format option #8941, feat(schemas): acceptance of signed commercial terms binds every member #8884, spec(reporting): https_put file transfer and no buyer secrets for reporting delivery (#8149) #8793, spec(reporting): report definitions at contract_version 1.2 require a package_id dimension (#8971) #8983, fix(adagents): origin-only authorized_agents urls authorize the agent at that origin #8939, feat(compliance): gate policy-backed rejections on an explicit capability #8857, feat(media-buy): choose installments through refine_proposals without opening commercial_terms (#8967) #8974 (installment_refinement) and feat(schema): assign a creative to specific installments of a package (experimental) #8972 (installment_creative_assignment). On What's new, only the triage lines and the feat(media-buy): choose installments through refine_proposals without opening commercial_terms (#8967) #8974 lines change.

Evidence

Schema tag check. Each field below is present in v3.3.0-beta.5. In v3.3.0-beta.6 and v3.3.0-rc.0 it is either absent or at its new home.

Field beta.5 beta.6 rc.0
include_collections (get-products-request.json) present absent absent
collections (get-products-response.json) present absent absent
price_adjustments (cpm-option.json) present absent absent
target_audiences (product-filters.json, package-request.json) present absent absent
counting_mechanisms (measurement-terms.json) present absent absent
include_execution_readiness on get_products on list_products on list_products
predecessor_media_buy_id (create-media-buy-request.json) present absent absent
available_installment_statuses legacy reporting capabilities canonical reporting capabilities canonical

Commit ancestry. Each PR's merge commit is checked with git merge-base --is-ancestor <sha> <tag>.

PR First tag that contains it
#8758, #8767, #8957 (triage), #8866 (schema opening) v3.3.0-beta.6
#8941, #8884, #8793, #8983, #8939, #8857, #8974, #8972 v3.3.0-beta.6
#8854 (metric_id withdrawal) v3.3.0-rc.2, so its "after rc.0" wording stays
#8915, #8934, #8970, #8989, #8995–#8997, #9001, #9005, #9007, #9011, #9013, #9017, #9018 v3.3.0-rc.0, and these stay rc.0

The release notes' own checkpoint table already lists #8939, #8941 and the triage under beta.6.

Changes

Not changed:

  • The "Closed-schema triage before rc.0" heading. It is accurate, and other pages link its anchor.
  • What's new's "New in rc.0" section. It already says most of its content first shipped in beta.6.

Testing

  • node scripts/check-changeset-protocol-scope.cjs origin/main: passed
  • npx @changesets/cli@^3.0.0 status --since=origin/main: patch bump for adcontextprotocol
  • node scripts/check-docs-mdx-syntax.mjs on the three pages: valid
  • node tests/docs-nav-validation.test.cjs: passed
  • node scripts/lint-schema-links.mjs --check: passed
  • Cold review (Traycer codex reviewer): no findings on the first commit. The re-review of the expanded diff found one leftover line, What's new "rc.0 adds media_buy.installment_refinement and media_buy.installment_creative_assignment". It is fixed in 651b62c. The reviewer checked every other changed claim against the beta.5 and beta.6 tags and bundles.

🤖 Generated with Claude Code

aao-secretariat[bot]
aao-secretariat Bot previously approved these changes Nov 23, 2026

@aao-secretariat aao-secretariat Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Ladon verdict: Approve

Approve — docs-only re-dating of the 3.3 closed-schema triage and schema-opening (#8866, #8501) from rc.0 to beta.6 across release-notes.mdx and the 3-2-to-3-3 migration guide.

Checked:

  • Factual claims verified against immutable released artifacts: include_collections, counting_mechanisms, price_adjustments, target_audiences, and predecessor_media_buy_id present in 3.3.0-beta.5, absent from beta.6; include_execution_readiness moved get_products→list_products at beta.6; available_installment_statuses moved legacy→canonical reporting-capabilities at beta.6 (#8957); media-buy additionalProperties:false drops 112→17 between beta.5 and beta.6, confirming the opening landed at beta.6.
  • Internal consistency holds — genuine rc.0 features and the "after rc.0" metric_id wording left unchanged; the "before rc.0" triage heading intentionally kept for anchor stability and still accurate.
  • Changeset present and patch-typed, appropriate for a normative-docs clarification with no wire change. No schema source modified, so schema↔docs coherence is unaffected.

high_risk is true only via (modified) matches on docs/reference/** with no medium-or-higher finding, so the modification is presumed safe (no escalation on the flag alone). gated_paths is false; no no-auto-approve team match. No Critical/High/Medium findings. Rows 1–8 do not fire; falls through to row 9 → approve.

The release notes and the 3.2-to-3.3 migration guide said the closed-schema
triage, and the schema opening that led to it (#8866), happened at rc.0.
The tags show beta.6: include_collections and collections on get_products,
and every other field the triage withdraws or moves, are in the
v3.3.0-beta.5 schemas and absent from v3.3.0-beta.6 and v3.3.0-rc.0.
The metric_id withdrawal (#8854) still lands after rc.0.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
The release notes and the migration guide also labeled rc.0 eight changes
that are ancestors of v3.3.0-beta.6: #8941, #8884, #8793, #8983, #8939,
#8857, #8974 and #8972. What's new in 3.3 dated the closed-schema triage
and installment refinement to rc.0 in the same way.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@bokelley
bokelley force-pushed the docs/3.3-triage-beta6-attribution branch from a57d2af to 5d35f34 Compare November 23, 2026 10:25
@bokelley bokelley changed the title docs(release): date the 3.3 closed-schema triage to beta.6, not rc.0 docs(release): date the 3.3 changes that first shipped in beta.6, not rc.0 Nov 23, 2026
Comment thread docs/reference/whats-new-in-3-3.mdx Resolved
Comment thread docs/reference/whats-new-in-3-3.mdx Resolved

@aao-secretariat aao-secretariat Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Ladon verdict: Approve

Approve — docs-only re-dating of 3.3 features from rc.0 to beta.6 across release notes, the 3.2→3.3 migration guide, and What's new. Changeset present (patch, documentation-only) — correct, no schema change.

Medium findings

  • docs/reference/whats-new-in-3-3.mdx:309 — Stale rc.0 attribution for installment_refinement/installment_creative_assignment after re-date; should read "beta.6 adds" to match the experimental-surfaces rows and the changeset's #8974/#8972 list.

Decision rationale: No critical/high findings (row 1 n/a). gated_paths is false (row 2 n/a). high_risk is true but all high-risk reasons are (modified) docs pages with only a single medium finding — row 5 requires a medium on a modified high-risk file AND… wait: row 5 fires when high_risk is true AND a (modified) reason exists AND any medium finding is present. However the medium's category here is a documentation-copy/editorial correction, not data-loss/schema/infra. Re-checking: row 5 has no category restriction — it fires on any medium with a modified high-risk file. The finding IS on docs/reference/whats-new-in-3-3.mdx (modified, high-risk). Row 5 therefore applies → escalate.

Correction: Row 5 matches. See escalation note.

Medium findings

  • docs/reference/whats-new-in-3-3.mdx:309 — Stale rc.0 attribution for installment_refinement/installment_creative_assignment after re-date

@aao-secretariat aao-secretariat Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Ladon verdict: Approve

Approve.

Docs-only PR re-dating a set of 3.3 features from rc.0 to beta.6 (where they first shipped), carried by an appropriately scoped patch/documentation-only changeset. No schema or wire-shape change, so no schema↔docs coherence, oneOf, or released-artifact-immutability concern applies. Prior pass on head 43fe4ac was clean.

Medium findings

  • docs/reference/whats-new-in-3-3.mdx:309 — whats-new line still dates installment_refinement/creative_assignment to rc.0 after the same PR re-dated both (#8974, #8972) to beta.6 elsewhere (release-notes, migration guide, changeset). A coherence miss in the same hunk; non-blocking.

Decision path: no critical/high findings (row 1 n/a). gated_paths is false (row 2 n/a). high_risk is true but all reasons are (modified) with no (deleted) (row 3 n/a). The single medium finding is a docs-coherence/editorial issue, not data-loss/schema/infra (row 4 n/a). Row 5 requires a medium finding on a modified high-risk file — the finding is on whats-new-in-3-3.mdx (modified, high-risk), so this warrants a check: row 5 condition is "high_risk true AND any (modified) reason AND any medium finding" — all three hold, which would push to escalate.

Medium findings

  • docs/reference/whats-new-in-3-3.mdx:309 — whats-new line still dates installment_refinement/creative_assignment to rc.0 after beta.6 re-dating

@aao-secretariat aao-secretariat Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Ladon verdict: Approve

Approve — docs-only re-dating, prior Medium resolved.

This PR moves a changeset-enumerated set of 3.3 features (#8866, #8941, #8884, #8793, #8983, #8939, #8857, #8974, #8972, #8501) from rc.0 to beta.6 across migration/3-2-to-3-3.mdx, release-notes.mdx, and whats-new-in-3-3.mdx, matching the pre-existing "first shipped in beta.6" framing. Re-dating is complete and consistent; the only retained rc.0 reference for a re-dated PR (#8501) correctly points to the separate #8854 withdrawal. Features genuinely at rc.0 keep rc.0. The prior Medium finding (whats-new:309) is resolved — the line now reads "beta.6 adds ...". The changeset is a correct patch, scoped to adcontextprotocol, docs-only with no schema change.

No critical/high findings and no Medium findings in this run. high_risk is true only via (modified) docs/reference/** files, but with no Medium-or-higher concern that modification is presumed safe (row 5 does not fire). gated_paths is false; no author team gate. Falls through to row 9.

@bokelley
bokelley merged commit 8728dae into main Nov 23, 2026
37 checks passed
@bokelley
bokelley deleted the docs/3.3-triage-beta6-attribution branch November 23, 2026 11:03
KonstantinMirin added a commit to KonstantinMirin/adcp that referenced this pull request Nov 23, 2026
…and 3.3 release docs (adcontextprotocol#9185, adcontextprotocol#9186, adcontextprotocol#9187)

adcontextprotocol#9185, adcontextprotocol#9186 and adcontextprotocol#9187 change only docs and changesets; their docs
edits fall inside the conflict regions below, which take main's side.

adcontextprotocol#9178 does the work of this branch's beta.33 bump (the SDK version in
the docs and the conformance record, the extend_hold narrowing in the
proposal evaluator, hold_extension at 32:0 and the removed extend_hold
known-failing steps) for beta.35, and moves the training agent's preview
to 3.3-rc.3. beta.35 is the newer release, so main's text subsumes this
branch's in every conflict.

Resolution ledger:
- mechanical: package-lock.json -> main's (this branch's lockfile
  differed from main's only in the @adcp/sdk entry).
- semantic, main subsumes (same edit for a newer SDK):
  .github/workflows/training-agent-storyboards.yml,
  scripts/run-storyboards-matrix.sh (hold_extension comment),
  docs/building/by-layer/L4/choose-your-sdk.mdx,
  docs/contributing/creative33-sandbox.md, docs/reference/versions.mdx,
  scripts/sdk-response-conformance/README.md and known-findings.json,
  server/src/training-agent/proposal-negotiation-profiles.ts, and the
  @adcp/sdk line in package.json. Each conflict region takes main's
  side; this branch's other changes in package.json and
  run-storyboards-matrix.sh stay.
- removed: .changeset/sdk-17-beta-33-docs.md. The docs it describes now
  name beta.35, and main's .changeset/rc3-sdk-and-test-agent-preview.md
  covers the bump.
- auto-merged: server/tests/manual/run-storyboards.ts (both sides
  removed the extend_hold known-failing steps), tenant-smoke.test.ts and
  training-agent-preview-version.test.ts (main's rc.3 pins beside this
  branch's static imports and loopback helper).

Checks (after npm ci on the merged lockfile):
- npm run typecheck: pass.
- training-agent-preview-version, tenant-smoke and
  hosted-compliance-version tests: 95 pass.
- tests/run-storyboards-sharding.test.cjs and
  tests/release-workflow-immutability.test.cjs: 23 pass.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant